LAPORAN > DATA EXISTING DAN PERKIRAAN BIAYA PEMBANGUNAN
A PHP Error was encountered
Severity: Warning
Message: Invalid argument supplied for foreach()
Filename: libraries/pipp_lib.php
Line Number: 95
A PHP Error was encountered
Severity: Warning
Message: Invalid argument supplied for foreach()
Filename: libraries/pipp_lib.php
Line Number: 95
A PHP Error was encountered
Severity: Warning
Message: Invalid argument supplied for foreach()
Filename: libraries/pipp_lib.php
Line Number: 95
A PHP Error was encountered
Severity: Warning
Message: Invalid argument supplied for foreach()
Filename: libraries/pipp_lib.php
Line Number: 95
NO |
NAMA PROVINSI |
KELAS PELABUHAN |
KATEGORI FASILITAS |
TIPE FASILITAS |
NILAI MINIMUM FASILITAS |
SATUAN FASILITAS |
ANGGARAN (Rp) |
WAJIB |
1 |
Kalimantan Utara |
PPS |
Fasilitas Pokok |
Lahan (m2) |
200.000 |
m2 |
50.000,00 |
Ya |
2 |
Sulawesi Barat |
PPS |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
3 |
m |
57.475,00 |
Ya |
3 |
Sumatera Barat |
PPS |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
3 |
m |
55.450,00 |
Ya |
4 |
Bengkulu |
PPS |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
3 |
m |
56.119,00 |
Ya |
5 |
Riau |
PPS |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
3 |
m |
63.300,00 |
Ya |
6 |
Lampung |
PPS |
Fasilitas Pokok |
Lahan (m2) |
200.000 |
m2 |
44.895,00 |
Ya |
7 |
Yogyakarta |
PPS |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
3 |
m |
54.075,00 |
Ya |
8 |
Sulawesi Barat |
PPS |
Fasilitas Pokok |
Dermaga (m2) |
300 |
m2 |
7.356.800,00 |
Ya |
9 |
Kalimantan Selatan |
PPS |
Fasilitas Pokok |
Lahan (m2) |
200.000 |
m2 |
48.940,00 |
Ya |
10 |
Maluku |
PPS |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
3 |
m |
63.138,00 |
Ya |
11 |
Jawa Tengah |
PPS |
Fasilitas Pokok |
Lahan (m2) |
200.000 |
m2 |
42.690,00 |
Ya |
12 |
Gorontalo |
PPS |
Fasilitas Pokok |
Dermaga (m2) |
300 |
m2 |
7.454.400,00 |
Ya |
13 |
Sulawesi Utara |
PPS |
Fasilitas Pokok |
Lahan (m2) |
200.000 |
m2 |
51.500,00 |
Ya |
14 |
Jawa Barat |
PPS |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
3 |
m |
55.688,00 |
Ya |
15 |
Gorontalo |
PPS |
Fasilitas Pokok |
Lahan (m2) |
200.000 |
m2 |
46.590,00 |
Ya |
16 |
DKI. Jakarta |
PPS |
Fasilitas Pokok |
Lahan (m2) |
200.000 |
m2 |
50.000,00 |
Ya |
17 |
Sulawesi Selatan |
PPS |
Fasilitas Pokok |
Dermaga (m2) |
300 |
m2 |
6.871.200,00 |
Ya |
18 |
Maluku Utara |
PPS |
Fasilitas Pokok |
Dermaga (m2) |
300 |
m2 |
9.209.600,00 |
Ya |
19 |
Sulawesi Selatan |
PPS |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
3 |
m |
53.681,00 |
Ya |
20 |
Kalimantan Timur |
PPS |
Fasilitas Pokok |
Dermaga (m2) |
300 |
m2 |
8.000.000,00 |
Ya |
21 |
Kalimantan Timur |
PPS |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
3 |
m |
62.500,00 |
Ya |
22 |
Kalimantan Barat |
PPS |
Fasilitas Pokok |
Dermaga (m2) |
300 |
m2 |
8.590.400,00 |
Ya |
23 |
Kalimantan Tengah |
PPS |
Fasilitas Pokok |
Lahan (m2) |
200.000 |
m2 |
50.145,00 |
Ya |
24 |
Kalimantan Barat |
PPS |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
3 |
m |
67.113,00 |
Ya |
25 |
Maluku Utara |
PPS |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
3 |
m |
71.950,00 |
Ya |
26 |
Kalimantan Tengah |
PPS |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
3 |
m |
62.681,00 |
Ya |
27 |
Papua Barat |
PPS |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
3 |
m |
75.631,00 |
Ya |
28 |
Jawa Barat |
PPS |
Fasilitas Pokok |
Lahan (m2) |
200.000 |
m2 |
44.550,00 |
Ya |
29 |
Jambi |
PPS |
Fasilitas Pokok |
Dermaga (m2) |
300 |
m |
7.757.600,00 |
Ya |
30 |
Bengkulu |
PPS |
Fasilitas Pokok |
Lahan (m2) |
200.000 |
m2 |
44.895,00 |
Ya |
31 |
Aceh |
PPS |
Fasilitas Pokok |
Dermaga (m2) |
300 |
m |
8.102.400,00 |
Ya |
32 |
Aceh |
PPS |
Fasilitas Pokok |
Lahan (m2) |
200.000 |
m2 |
47.960,00 |
Ya |
33 |
Nusa Tenggara Barat |
PPS |
Fasilitas Pokok |
Lahan (m2) |
200.000 |
m2 |
40.050,00 |
Ya |
34 |
Papua |
PPS |
Fasilitas Pokok |
Dermaga (m2) |
300 |
m2 |
15.096.000,00 |
Ya |
35 |
Kalimantan Tengah |
PPS |
Fasilitas Pokok |
Dermaga (m2) |
300 |
m2 |
8.023.200,00 |
Ya |
36 |
Aceh |
PPS |
Fasilitas Pokok |
Dermaga (m2) |
300 |
m |
7.328.800,00 |
Ya |
37 |
Sumatera Selatan |
PPS |
Fasilitas Pokok |
Dermaga (m2) |
300 |
m |
7.623.200,00 |
Ya |
38 |
Jawa Barat |
PPS |
Fasilitas Pokok |
Lahan (m2) |
200.000 |
m2 |
44.550,00 |
Ya |
39 |
Sulawesi Tengah |
PPS |
Fasilitas Pokok |
Dermaga (m2) |
300 |
m2 |
6.768.000,00 |
Ya |
40 |
Sulawesi Tengah |
PPS |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
3 |
m |
52.875,00 |
Ya |
41 |
Kep. Riau |
PPS |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
3 |
m |
68.388,00 |
Ya |
42 |
Maluku |
PPS |
Fasilitas Pokok |
Lahan (m2) |
200.000 |
m2 |
50.510,00 |
Ya |
43 |
Kalimantan Selatan |
PPS |
Fasilitas Pokok |
Dermaga (m2) |
300 |
m2 |
7.830.400,00 |
Ya |
44 |
Lampung |
PPS |
Fasilitas Pokok |
Dermaga (m2) |
300 |
m |
71,00 |
Ya |
45 |
Sulawesi Tenggara |
PPS |
Fasilitas Pokok |
Lahan (m2) |
200.000 |
m2 |
48.210,00 |
Ya |
46 |
Sumatera Barat |
PPS |
Fasilitas Pokok |
Lahan (m2) |
200.000 |
m2 |
44.360,00 |
Ya |
47 |
Nusa Tenggara Timur |
PPS |
Fasilitas Pokok |
Lahan (m2) |
200.000 |
m2 |
43.835,00 |
Ya |
48 |
Kalimantan Utara |
PPS |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
3 |
m |
62.500,00 |
Ya |
49 |
Jawa Tengah |
PPS |
Fasilitas Pokok |
Dermaga (m2) |
300 |
m |
6.830.400,00 |
Ya |
50 |
Kep. Bangka Belitung |
PPS |
Fasilitas Pokok |
Dermaga (m2) |
300 |
m |
7.967.200,00 |
Ya |
51 |
Kep. Riau |
PPS |
Fasilitas Pokok |
Lahan (m2) |
200.000 |
m2 |
54.710,00 |
Ya |
52 |
DKI. Jakarta |
PPS |
Fasilitas Pokok |
Dermaga (m2) |
300 |
m |
8.000.000,00 |
Ya |
53 |
Maluku Utara |
PPS |
Fasilitas Pokok |
Lahan (m2) |
200.000 |
m2 |
57.560,00 |
Ya |
54 |
Nusa Tenggara Timur |
PPS |
Fasilitas Pokok |
Dermaga (m2) |
300 |
m2 |
7.013.600,00 |
Ya |
55 |
Kalimantan Utara |
PPS |
Fasilitas Pokok |
Dermaga (m2) |
300 |
m2 |
8.000.000,00 |
Ya |
56 |
Sulawesi Barat |
PPS |
Fasilitas Pokok |
Lahan (m2) |
200.000 |
m2 |
45.980,00 |
Ya |
57 |
Kalimantan Selatan |
PPS |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
3 |
m |
61.175,00 |
Ya |
58 |
Aceh |
PPS |
Fasilitas Pokok |
Lahan (m2) |
200.000 |
m2 |
45.805,00 |
Ya |
59 |
Papua Barat |
PPS |
Fasilitas Pokok |
Lahan (m2) |
200.000 |
m2 |
60.505,00 |
Ya |
60 |
Sulawesi Utara |
PPS |
Fasilitas Pokok |
Dermaga (m2) |
300 |
m2 |
8.240.000,00 |
Ya |
61 |
Sulawesi Utara |
PPS |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
3 |
m |
64.375,00 |
Ya |
62 |
Jawa Barat |
PPS |
Fasilitas Pokok |
Dermaga (m2) |
300 |
m |
7.128.000,00 |
Ya |
63 |
Jambi |
PPS |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
3 |
m |
60.606,00 |
Ya |
64 |
Maluku |
PPS |
Fasilitas Pokok |
Dermaga (m2) |
300 |
m2 |
8.081.600,00 |
Ya |
65 |
Kep. Bangka Belitung |
PPS |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
3 |
m |
62.244,00 |
Ya |
66 |
Bengkulu |
PPS |
Fasilitas Pokok |
Dermaga (m2) |
300 |
m |
7.183.200,00 |
Ya |
67 |
Kep. Riau |
PPS |
Fasilitas Pokok |
Dermaga (m2) |
300 |
m |
8.753.600,00 |
Ya |
68 |
Sulawesi Selatan |
PPS |
Fasilitas Pokok |
Lahan (m2) |
200.000 |
m2 |
42.945,00 |
Ya |
69 |
Kalimantan Timur |
PPS |
Fasilitas Pokok |
Lahan (m2) |
200.000 |
m2 |
50.000,00 |
Ya |
70 |
Yogyakarta |
PPS |
Fasilitas Pokok |
Dermaga (m2) |
300 |
m |
6.921.600,00 |
Ya |
71 |
Papua Barat |
PPS |
Fasilitas Pokok |
Dermaga (m2) |
300 |
m2 |
9.680.800,00 |
Ya |
72 |
Nusa Tenggara Timur |
PPS |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
3 |
m |
54.794,00 |
Ya |
73 |
Kalimantan Barat |
PPS |
Fasilitas Pokok |
Lahan (m2) |
200.000 |
m2 |
53.690,00 |
Ya |
74 |
Aceh |
PPS |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
3 |
m |
57.256,00 |
Ya |
75 |
Sumatera Selatan |
PPS |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
3 |
m |
59.556,00 |
Ya |
76 |
Jawa Barat |
PPS |
Fasilitas Pokok |
Dermaga (m2) |
300 |
m |
7.128.000,00 |
Ya |
77 |
Kep. Bangka Belitung |
PPS |
Fasilitas Pokok |
Lahan (m2) |
200.000 |
m2 |
49.795,00 |
Ya |
78 |
Nusa Tenggara Barat |
PPS |
Fasilitas Pokok |
Dermaga (m2) |
300 |
m2 |
6.408.000,00 |
Ya |
79 |
Lampung |
PPS |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
3 |
m |
56.119,00 |
Ya |
80 |
Nusa Tenggara Barat |
PPS |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
3 |
m |
50.063,00 |
Ya |
81 |
Papua |
PPS |
Fasilitas Pokok |
Lahan (m2) |
200.000 |
m2 |
94.350,00 |
Ya |
82 |
Sumatera Barat |
PPS |
Fasilitas Pokok |
Dermaga (m2) |
300 |
m |
7.097.600,00 |
Ya |
83 |
Jawa Tengah |
PPS |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
3 |
m |
53.363,00 |
Ya |
84 |
Papua |
PPS |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
3 |
m |
117.938,00 |
Ya |
85 |
Jambi |
PPS |
Fasilitas Pokok |
Lahan (m2) |
200.000 |
m2 |
48.485,00 |
Ya |
86 |
Sulawesi Tengah |
PPS |
Fasilitas Pokok |
Lahan (m2) |
200.000 |
m2 |
42.300,00 |
Ya |
87 |
DKI. Jakarta |
PPS |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
3 |
m |
62.500,00 |
Ya |
88 |
Aceh |
PPS |
Fasilitas Pokok |
Lahan (m2) |
200.000 |
m2 |
50.640,00 |
Ya |
89 |
Gorontalo |
PPS |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
3 |
m |
58.238,00 |
Ya |
90 |
Sumatera Utara |
PPS |
Fasilitas Pokok |
Dermaga (m2) |
300 |
m |
7.673.600,00 |
Ya |
91 |
Sulawesi Tenggara |
PPS |
Fasilitas Pokok |
Dermaga (m2) |
300 |
m2 |
7.713.600,00 |
Ya |
92 |
Sulawesi Tenggara |
PPS |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
3 |
m |
60.263,00 |
Ya |
93 |
Lampung |
PPP |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
2 |
m |
44.895,00 |
Ya |
94 |
Yogyakarta |
PPP |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
2 |
m |
54.075,00 |
Ya |
95 |
Aceh |
PPP |
Fasilitas Pokok |
Lahan (m2) |
2 |
m |
54.794,00 |
Ya |
96 |
Papua |
PPP |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
2 |
m |
117.938,00 |
Ya |
97 |
Kalimantan Barat |
PPP |
Fasilitas Pokok |
Lahan (m2) |
50.000 |
m2 |
53.690,00 |
Ya |
98 |
Maluku Utara |
PPP |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
2 |
m |
71.950,00 |
Ya |
99 |
Sumatera Selatan |
PPP |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
2 |
m |
59.556,00 |
Ya |
100 |
Jawa Barat |
PPP |
Fasilitas Pokok |
Dermaga (m2) |
100 |
m |
7.128.000,00 |
Ya |
101 |
Maluku Utara |
PPP |
Fasilitas Pokok |
Lahan (m2) |
50.000 |
m2 |
57.560,00 |
Ya |
102 |
Nusa Tenggara Barat |
PPP |
Fasilitas Pokok |
Dermaga (m2) |
100 |
m2 |
6.408.000,00 |
Ya |
103 |
Bengkulu |
PPP |
Fasilitas Pokok |
Dermaga (m2) |
100 |
m |
7.183.200,00 |
Ya |
104 |
Nusa Tenggara Barat |
PPP |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
2 |
m |
50.063,00 |
Ya |
105 |
Kep. Bangka Belitung |
PPP |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
2 |
m |
62.244,00 |
Ya |
106 |
Papua |
PPP |
Fasilitas Pokok |
Lahan (m2) |
50.000 |
m2 |
94.350,00 |
Ya |
107 |
Aceh |
PPP |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
2 |
m |
57.256,00 |
Ya |
108 |
Papua Barat |
PPP |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
2 |
m |
75.631,00 |
Ya |
109 |
Jawa Tengah |
PPP |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
20.000 |
m |
53.363,00 |
Ya |
110 |
Sumatera Barat |
PPP |
Fasilitas Pokok |
Dermaga (m2) |
100 |
m |
7.097.600,00 |
Ya |
111 |
Sulawesi Tengah |
PPP |
Fasilitas Pokok |
Lahan (m2) |
50.000 |
m2 |
42.300,00 |
Ya |
112 |
Maluku |
PPP |
Fasilitas Pokok |
Dermaga (m2) |
100 |
m2 |
8.081.600,00 |
Ya |
113 |
Jambi |
PPP |
Fasilitas Pokok |
Lahan (m2) |
50.000 |
m2 |
48.485,00 |
Ya |
114 |
|
PPP |
Fasilitas Pokok |
Jalan Komplek (m) |
1.500 |
m |
1.500.000,00 |
Ya |
115 |
DKI. Jakarta |
PPP |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
2 |
m |
62.500,00 |
Ya |
116 |
Sulawesi Tenggara |
PPP |
Fasilitas Pokok |
Dermaga (m2) |
100 |
m2 |
7.713.600,00 |
Ya |
117 |
Kep. Riau |
PPP |
Fasilitas Pokok |
Dermaga (m2) |
100 |
m |
8.753.600,00 |
Ya |
118 |
Papua |
PPP |
Fasilitas Pokok |
Dermaga (m2) |
100 |
m2 |
15.096.000,00 |
Ya |
119 |
Sulawesi Tenggara |
PPP |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
2 |
m |
60.263,00 |
Ya |
120 |
Kalimantan Utara |
PPP |
Fasilitas Pokok |
Lahan (m2) |
50.000 |
m2 |
50.000,00 |
Ya |
121 |
Papua Barat |
PPP |
Fasilitas Pokok |
Dermaga (m2) |
100 |
m2 |
9.680.800,00 |
Ya |
122 |
Sulawesi Barat |
PPP |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
2 |
m |
57.475,00 |
Ya |
123 |
Sumatera Selatan |
PPP |
Fasilitas Pokok |
Lahan (m2) |
50.000 |
m2 |
47.645,00 |
Ya |
124 |
Riau |
PPP |
Fasilitas Pokok |
Dermaga (m2) |
100 |
m |
8.102.400,00 |
Ya |
125 |
Sulawesi Barat |
PPP |
Fasilitas Pokok |
Dermaga (m2) |
100 |
m2 |
7.356.800,00 |
Ya |
126 |
Kalimantan Selatan |
PPP |
Fasilitas Pokok |
Lahan (m2) |
50.000 |
m2 |
48.940,00 |
Ya |
127 |
Kep. Bangka Belitung |
PPP |
Fasilitas Pokok |
Dermaga (m2) |
100 |
m |
7.967.200,00 |
Ya |
128 |
Lampung |
PPP |
Fasilitas Pokok |
Lahan (m2) |
50.000 |
m2 |
44.895,00 |
Ya |
129 |
Yogyakarta |
PPP |
Fasilitas Pokok |
Lahan (m2) |
50.000 |
m2 |
43.260,00 |
Ya |
130 |
Aceh |
PPP |
Fasilitas Pokok |
Lahan (m2) |
50.000 |
m2 |
45.805,00 |
Ya |
131 |
Gorontalo |
PPP |
Fasilitas Pokok |
Dermaga (m2) |
100 |
m2 |
7.454.400,00 |
Ya |
132 |
Jawa Tengah |
PPP |
Fasilitas Pokok |
Lahan (m2) |
50.000 |
m2 |
42.690,00 |
Ya |
133 |
Sulawesi Utara |
PPP |
Fasilitas Pokok |
Lahan (m2) |
50.000 |
m2 |
51.500,00 |
Ya |
134 |
|
PPP |
Fasilitas Pokok |
Lahan (m2) |
50.000 |
m2 |
1.000.000,00 |
Ya |
135 |
Jawa Barat |
PPP |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
2 |
m |
55.688,00 |
Ya |
136 |
Gorontalo |
PPP |
Fasilitas Pokok |
Lahan (m2) |
50.000 |
m2 |
46.590,00 |
Ya |
137 |
Sulawesi Selatan |
PPP |
Fasilitas Pokok |
Dermaga (m2) |
100 |
m2 |
6.871.200,00 |
Ya |
138 |
Gorontalo |
PPP |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
2 |
m |
58.238,00 |
Ya |
139 |
DKI. Jakarta |
PPP |
Fasilitas Pokok |
Lahan (m2) |
50.000 |
m2 |
50.000,00 |
Ya |
140 |
Sulawesi Selatan |
PPP |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
2 |
m |
53.681,00 |
Ya |
141 |
Kalimantan Timur |
PPP |
Fasilitas Pokok |
Dermaga (m2) |
100 |
m2 |
8.000.000,00 |
Ya |
142 |
Bengkulu |
PPP |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
2 |
m |
56.119,00 |
Ya |
143 |
Kalimantan Timur |
PPP |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
2 |
m |
62.500,00 |
Ya |
144 |
Nusa Tenggara Timur |
PPP |
Fasilitas Pokok |
Lahan (m2) |
50.000 |
m2 |
43.835,00 |
Ya |
145 |
Sumatera Utara |
PPP |
Fasilitas Pokok |
Dermaga (m2) |
100 |
m |
7.673.600,00 |
Ya |
146 |
Maluku |
PPP |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
2 |
m |
63.138,00 |
Ya |
147 |
Kalimantan Barat |
PPP |
Fasilitas Pokok |
Dermaga (m2) |
100 |
m2 |
8.590.400,00 |
Ya |
148 |
Kalimantan Tengah |
PPP |
Fasilitas Pokok |
Lahan (m2) |
50.000 |
m2 |
50.145,00 |
Ya |
149 |
Papua Barat |
PPP |
Fasilitas Pokok |
Lahan (m2) |
50.000 |
m2 |
60.505,00 |
Ya |
150 |
Kalimantan Barat |
PPP |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
2 |
m |
67.113,00 |
Ya |
151 |
Maluku Utara |
PPP |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
2 |
m |
71.950,00 |
Ya |
152 |
Jambi |
PPP |
Fasilitas Pokok |
Dermaga (m2) |
100 |
m2 |
7.757.600,00 |
Ya |
153 |
|
PPP |
Fasilitas Pokok |
Drainase (m) |
1.500 |
m |
350.000,00 |
Ya |
154 |
Maluku |
PPP |
Fasilitas Pokok |
Lahan (m2) |
50.000 |
m2 |
50.510,00 |
Ya |
155 |
Nusa Tenggara Barat |
PPP |
Fasilitas Pokok |
Lahan (m2) |
50.000 |
m2 |
40.050,00 |
Ya |
156 |
Kep. Riau |
PPP |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
2 |
m |
68.388,00 |
Ya |
157 |
Yogyakarta |
PPP |
Fasilitas Pokok |
Lahan (m2) |
50.000 |
m2 |
43.260,00 |
Ya |
158 |
Yogyakarta |
PPP |
Fasilitas Pokok |
Dermaga (m2) |
100 |
m |
6.921.600,00 |
Ya |
159 |
Kalimantan Tengah |
PPP |
Fasilitas Pokok |
Dermaga (m2) |
100 |
m2 |
8.023.200,00 |
Ya |
160 |
Sulawesi Tengah |
PPP |
Fasilitas Pokok |
Dermaga (m2) |
100 |
m2 |
6.768.000,00 |
Ya |
161 |
Jawa Barat |
PPP |
Fasilitas Pokok |
Lahan (m2) |
50.000 |
m2 |
44.550,00 |
Ya |
162 |
Sulawesi Tengah |
PPP |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
2 |
m |
52.875,00 |
Ya |
163 |
Maluku Utara |
PPP |
Fasilitas Pokok |
Dermaga (m2) |
100 |
m2 |
9.209.600,00 |
Ya |
164 |
Bengkulu |
PPP |
Fasilitas Pokok |
Lahan (m2) |
50.000 |
m2 |
44.895,00 |
Ya |
165 |
Aceh |
PPP |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
3 |
m |
59.950,00 |
Ya |
166 |
Riau |
PPP |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
2 |
m |
63.300,00 |
Ya |
167 |
Sulawesi Tenggara |
PPP |
Fasilitas Pokok |
Lahan (m2) |
50.000 |
m2 |
48.210,00 |
Ya |
168 |
Aceh |
PPP |
Fasilitas Pokok |
Lahan (m2) |
50.000 |
m2 |
47.960,00 |
Ya |
169 |
Lampung |
PPP |
Fasilitas Pokok |
Dermaga (m2) |
100 |
m |
7.183.200,00 |
Ya |
170 |
Aceh |
PPP |
Fasilitas Pokok |
Dermaga (m2) |
100 |
m |
7.328.800,00 |
Ya |
171 |
Kalimantan Utara |
PPP |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
2 |
m |
62.500,00 |
Ya |
172 |
Kalimantan Tengah |
PPP |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
2 |
m |
62.681,00 |
Ya |
173 |
Jawa Tengah |
PPP |
Fasilitas Pokok |
Dermaga (m2) |
100 |
m |
6.830.400,00 |
Ya |
174 |
Sumatera Barat |
PPP |
Fasilitas Pokok |
Lahan (m2) |
50.000 |
m2 |
44.360,00 |
Ya |
175 |
|
PPP |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
20.000 |
m3 |
100.000,00 |
Ya |
176 |
DKI. Jakarta |
PPP |
Fasilitas Pokok |
Dermaga (m2) |
100 |
m |
8.000.000,00 |
Ya |
177 |
Kep. Riau |
PPP |
Fasilitas Pokok |
Lahan (m2) |
50.000 |
m2 |
54.710,00 |
Ya |
178 |
Nusa Tenggara Timur |
PPP |
Fasilitas Pokok |
Dermaga (m2) |
100 |
m2 |
7.013.600,00 |
Ya |
179 |
Kalimantan Utara |
PPP |
Fasilitas Pokok |
Dermaga (m2) |
100 |
m2 |
8.000.000,00 |
Ya |
180 |
Sulawesi Barat |
PPP |
Fasilitas Pokok |
Lahan (m2) |
50.000 |
m2 |
45.980,00 |
Ya |
181 |
Aceh |
PPP |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
2 |
m |
59.950,00 |
Ya |
182 |
Kalimantan Selatan |
PPP |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
2 |
m |
61.175,00 |
Ya |
183 |
Sulawesi Utara |
PPP |
Fasilitas Pokok |
Dermaga (m2) |
100 |
m2 |
8.240.000,00 |
Ya |
184 |
Sulawesi Utara |
PPP |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
2 |
m |
64.375,00 |
Ya |
185 |
Sumatera Barat |
PPP |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
2 |
m |
55.450,00 |
Ya |
186 |
Jambi |
PPP |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
2 |
m |
60.606,00 |
Ya |
187 |
|
PPP |
Fasilitas Pokok |
Dermaga (m2) |
500 |
m2 |
6.000.000,00 |
Ya |
188 |
Sulawesi Selatan |
PPP |
Fasilitas Pokok |
Lahan (m2) |
50.000 |
m2 |
42.945,00 |
Ya |
189 |
Kalimantan Selatan |
PPP |
Fasilitas Pokok |
Dermaga (m2) |
100 |
m2 |
7.830.400,00 |
Ya |
190 |
Riau |
PPP |
Fasilitas Pokok |
Lahan (m2) |
50.000 |
m2 |
50.640,00 |
Ya |
191 |
Kalimantan Timur |
PPP |
Fasilitas Pokok |
Lahan (m2) |
50.000 |
m2 |
50.000,00 |
Ya |
192 |
Kep. Bangka Belitung |
PPP |
Fasilitas Pokok |
Lahan (m2) |
50.000 |
m2 |
49.795,00 |
Ya |
193 |
Yogyakarta |
PPP |
Fasilitas Pokok |
Dermaga (m2) |
100 |
m |
6.921.600,00 |
Ya |
194 |
|
PPP |
Fasilitas Penunjang |
MCK (unit) |
10 |
m2 |
3.500.000,00 |
Ya |
195 |
|
PPP |
Fasilitas Penunjang |
Pos Jaga (unit) |
6 |
m2 |
3.500.000,00 |
Ya |
196 |
|
PPP |
Fasilitas Fungsional |
Kantor (m2) |
250 |
m2 |
3.500.000,00 |
Ya |
197 |
|
PPP |
Fasilitas Fungsional |
TPI (m) |
300 |
m2 |
3.000.000,00 |
Ya |
198 |
|
PPP |
Fasilitas Fungsional |
Air Bersih (debit) |
1 |
Unit |
3.000.000,00 |
Ya |
199 |
|
PPP |
Fasilitas Fungsional |
Listrik (kVA) |
30 |
Unit Solar Sel |
75.000.000,00 |
Ya |
200 |
|
PPP |
Fasilitas Fungsional |
Air Bersih (debit) |
1 |
unit |
20.000.000,00 |
Ya |
201 |
Kalimantan Tengah |
PPN |
Fasilitas Pokok |
Dermaga (m2) |
150 |
m2 |
8.023.200,00 |
Ya |
202 |
Papua Barat |
PPN |
Fasilitas Pokok |
Dermaga (m2) |
150 |
m2 |
9.680.800,00 |
Ya |
203 |
Jawa Tengah |
PPN |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
3 |
m |
53.363,00 |
Ya |
204 |
Sumatera Barat |
PPN |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
3 |
m |
55.450,00 |
Ya |
205 |
Sulawesi Tengah |
PPN |
Fasilitas Pokok |
Dermaga (m2) |
150 |
m2 |
6.768.000,00 |
Ya |
206 |
Jambi |
PPN |
Fasilitas Pokok |
Lahan (m2) |
100.000 |
m2 |
48.485,00 |
Ya |
207 |
Sulawesi Tengah |
PPN |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
3 |
m |
52.875,00 |
Ya |
208 |
DKI. Jakarta |
PPN |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
3 |
m |
62.500,00 |
Ya |
209 |
Kep. Riau |
PPN |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
3 |
m |
68.388,00 |
Ya |
210 |
Sulawesi Tenggara |
PPN |
Fasilitas Pokok |
Lahan (m2) |
100.000 |
m2 |
48.210,00 |
Ya |
211 |
Nusa Tenggara Timur |
PPN |
Fasilitas Pokok |
Lahan (m2) |
100.000 |
m2 |
43.835,00 |
Ya |
212 |
Papua |
PPN |
Fasilitas Pokok |
Lahan (m2) |
100.000 |
m2 |
94.350,00 |
Ya |
213 |
Kalimantan Utara |
PPN |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
3 |
m |
62.500,00 |
Ya |
214 |
Papua |
PPN |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
3 |
m |
117.938,00 |
Ya |
215 |
Sumatera Selatan |
PPN |
Fasilitas Pokok |
Lahan (m2) |
100.000 |
m2 |
47.645,00 |
Ya |
216 |
Gorontalo |
PPN |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
3 |
m |
58.238,00 |
Ya |
217 |
Kep. Riau |
PPN |
Fasilitas Pokok |
Lahan (m2) |
100.000 |
m2 |
54.710,00 |
Ya |
218 |
Riau |
PPN |
Fasilitas Pokok |
Dermaga (m2) |
150 |
m |
8.102.400,00 |
Ya |
219 |
Nusa Tenggara Timur |
PPN |
Fasilitas Pokok |
Dermaga (m2) |
150 |
m2 |
7.013.600,00 |
Ya |
220 |
Lampung |
PPN |
Fasilitas Pokok |
Lahan (m2) |
100.000 |
m2 |
44.895,00 |
Ya |
221 |
Yogyakarta |
PPN |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
3 |
m |
54.075,00 |
Ya |
222 |
Kalimantan Utara |
PPN |
Fasilitas Pokok |
Dermaga (m2) |
150 |
m2 |
8.000.000,00 |
Ya |
223 |
Aceh |
PPN |
Fasilitas Pokok |
Lahan (m2) |
100.000 |
m2 |
45.980,00 |
Ya |
224 |
Kalimantan Selatan |
PPN |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
3 |
m |
61.175,00 |
Ya |
225 |
Aceh |
PPN |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
3 |
m |
57.256,00 |
Ya |
226 |
Papua Barat |
PPN |
Fasilitas Pokok |
Lahan (m2) |
100.000 |
m2 |
60.505,00 |
Ya |
227 |
Jawa Tengah |
PPN |
Fasilitas Pokok |
Lahan (m2) |
100.000 |
m2 |
42.690,00 |
Ya |
228 |
Sulawesi Utara |
PPN |
Fasilitas Pokok |
Dermaga (m2) |
150 |
m2 |
8.240.000,00 |
Ya |
229 |
Sulawesi Utara |
PPN |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
3 |
m |
64.375,00 |
Ya |
230 |
Jawa Barat |
PPN |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
3 |
m |
55.688,00 |
Ya |
231 |
DKI. Jakarta |
PPN |
Fasilitas Pokok |
Lahan (m2) |
100.000 |
m2 |
50.000,00 |
Ya |
232 |
Sulawesi Selatan |
PPN |
Fasilitas Pokok |
Lahan (m2) |
100.000 |
m2 |
42.945,00 |
Ya |
233 |
Bengkulu |
PPN |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
3 |
m |
56.119,00 |
Ya |
234 |
Kep. Riau |
PPN |
Fasilitas Pokok |
Dermaga (m2) |
150 |
m |
8.753.600,00 |
Ya |
235 |
Kalimantan Timur |
PPN |
Fasilitas Pokok |
Lahan (m2) |
100.000 |
m2 |
50.000,00 |
Ya |
236 |
Nusa Tenggara Timur |
PPN |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
3 |
m |
54.794,00 |
Ya |
237 |
Kalimantan Barat |
PPN |
Fasilitas Pokok |
Lahan (m2) |
100.000 |
m2 |
53.690,00 |
Ya |
238 |
Sumatera Barat |
PPN |
Fasilitas Pokok |
Lahan (m2) |
100.000 |
m2 |
44.360,00 |
Ya |
239 |
Jambi |
PPN |
Fasilitas Pokok |
Dermaga (m2) |
150 |
m |
7.757.600,00 |
Ya |
240 |
Maluku Utara |
PPN |
Fasilitas Pokok |
Dermaga (m2) |
150 |
m2 |
9.209.600,00 |
Ya |
241 |
Nusa Tenggara Barat |
PPN |
Fasilitas Pokok |
Dermaga (m2) |
150 |
m2 |
6.408.000,00 |
Ya |
242 |
Sumatera Utara |
PPN |
Fasilitas Pokok |
Lahan (m2) |
100.000 |
m2 |
47.960,00 |
Ya |
243 |
Yogyakarta |
PPN |
Fasilitas Pokok |
Lahan (m2) |
100.000 |
m2 |
43.260,00 |
Ya |
244 |
Nusa Tenggara Barat |
PPN |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
3 |
m |
50.063,00 |
Ya |
245 |
Aceh |
PPN |
Fasilitas Pokok |
Lahan (m2) |
100.000 |
m2 |
45.805,00 |
Ya |
246 |
Maluku |
PPN |
Fasilitas Pokok |
Pager (m2) |
1.000.000 |
meter |
1.000.000,00 |
Ya |
247 |
Sumatera Selatan |
PPN |
Fasilitas Pokok |
Dermaga (m2) |
150 |
m |
7.623.200,00 |
Ya |
248 |
Kalimantan Tengah |
PPN |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
3 |
m |
62.681,00 |
Ya |
249 |
Sumatera Barat |
PPN |
Fasilitas Pokok |
Dermaga (m2) |
150 |
m |
44.360,00 |
Ya |
250 |
Jawa Barat |
PPN |
Fasilitas Pokok |
Lahan (m2) |
100.000 |
m2 |
44.550,00 |
Ya |
251 |
Sulawesi Tengah |
PPN |
Fasilitas Pokok |
Lahan (m2) |
100.000 |
m2 |
42.300,00 |
Ya |
252 |
Kep. Bangka Belitung |
PPN |
Fasilitas Pokok |
Dermaga (m2) |
150 |
m |
7.967.200,00 |
Ya |
253 |
Bengkulu |
PPN |
Fasilitas Pokok |
Dermaga (m2) |
150 |
m |
7.183.200,00 |
Ya |
254 |
Riau |
PPN |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
3 |
m |
63.300,00 |
Ya |
255 |
Sulawesi Tenggara |
PPN |
Fasilitas Pokok |
Dermaga (m2) |
150 |
m2 |
7.713.600,00 |
Ya |
256 |
Sumatera Utara |
PPN |
Fasilitas Pokok |
Dermaga (m2) |
150 |
m |
7.673.600,00 |
Ya |
257 |
Lampung |
PPN |
Fasilitas Pokok |
Dermaga (m2) |
150 |
m |
7.183.200,00 |
Ya |
258 |
Sulawesi Tenggara |
PPN |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
3 |
m |
60.263,00 |
Ya |
259 |
Kalimantan Utara |
PPN |
Fasilitas Pokok |
Lahan (m2) |
100.000 |
m2 |
50.000,00 |
Ya |
260 |
Sulawesi Barat |
PPN |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
3 |
m |
57.475,00 |
Ya |
261 |
Jawa Tengah |
PPN |
Fasilitas Pokok |
Dermaga (m2) |
150 |
m |
6.830.400,00 |
Ya |
262 |
Sumatera Selatan |
PPN |
Fasilitas Pokok |
Dermaga (m2) |
100 |
m |
7.623.200,00 |
Ya |
263 |
DKI. Jakarta |
PPN |
Fasilitas Pokok |
Dermaga (m2) |
150 |
m |
8.000.000,00 |
Ya |
264 |
Maluku |
PPN |
Fasilitas Pokok |
Lahan (m2) |
100.000 |
m2 |
50.510,00 |
Ya |
265 |
Kep. Bangka Belitung |
PPN |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
3 |
m |
62.244,00 |
Ya |
266 |
Kalimantan Selatan |
PPN |
Fasilitas Pokok |
Dermaga (m2) |
150 |
m2 |
7.830.400,00 |
Ya |
267 |
Sulawesi Barat |
PPN |
Fasilitas Pokok |
Dermaga (m2) |
150 |
m2 |
7.356.800,00 |
Ya |
268 |
Kalimantan Selatan |
PPN |
Fasilitas Pokok |
Lahan (m2) |
100.000 |
m2 |
48.940,00 |
Ya |
269 |
Maluku |
PPN |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
3 |
m |
63.138,00 |
Ya |
270 |
Sulawesi Barat |
PPN |
Fasilitas Pokok |
Dermaga (m2) |
150 |
m2 |
7.454.400,00 |
Ya |
271 |
Sulawesi Utara |
PPN |
Fasilitas Pokok |
Lahan (m2) |
100.000 |
m2 |
51.500,00 |
Ya |
272 |
Maluku |
PPN |
Fasilitas Pokok |
Trestle (m2) |
0 |
|
0,00 |
Ya |
273 |
Jambi |
PPN |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
3 |
m |
60.606,00 |
Ya |
274 |
Gorontalo |
PPN |
Fasilitas Pokok |
Lahan (m2) |
100.000 |
m2 |
46.590,00 |
Ya |
275 |
Sulawesi Selatan |
PPN |
Fasilitas Pokok |
Dermaga (m2) |
150 |
m2 |
6.871.200,00 |
Ya |
276 |
Kep. Bangka Belitung |
PPN |
Fasilitas Pokok |
Lahan (m2) |
100.000 |
m2 |
49.795,00 |
Ya |
277 |
Maluku Utara |
PPN |
Fasilitas Pokok |
Lahan (m2) |
100.000 |
m2 |
57.560,00 |
Ya |
278 |
Bengkulu |
PPN |
Fasilitas Pokok |
Lahan (m2) |
100.000 |
m2 |
44.895,00 |
Ya |
279 |
Riau |
PPN |
Fasilitas Pokok |
Lahan (m2) |
100.000 |
m2 |
50.640,00 |
Ya |
280 |
Sulawesi Selatan |
PPN |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
3 |
m |
53.681,00 |
Ya |
281 |
Kalimantan Timur |
PPN |
Fasilitas Pokok |
Dermaga (m2) |
150 |
m2 |
8.000.000,00 |
Ya |
282 |
Kalimantan Timur |
PPN |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
3 |
m |
62.500,00 |
Ya |
283 |
Yogyakarta |
PPN |
Fasilitas Pokok |
Dermaga (m2) |
150 |
m |
6.921.600,00 |
Ya |
284 |
Kalimantan Barat |
PPN |
Fasilitas Pokok |
Dermaga (m2) |
150 |
m2 |
8.590.400,00 |
Ya |
285 |
Aceh |
PPN |
Fasilitas Pokok |
Dermaga (m2) |
150 |
m |
7.328.800,00 |
Ya |
286 |
Kalimantan Tengah |
PPN |
Fasilitas Pokok |
Lahan (m2) |
100.000 |
m2 |
50.145,00 |
Ya |
287 |
Kalimantan Barat |
PPN |
Fasilitas Pokok |
Dermaga (m2) |
3 |
m |
67.113,00 |
Ya |
288 |
Maluku Utara |
PPN |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
3 |
m |
71.950,00 |
Ya |
289 |
Sumatera Selatan |
PPN |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
3 |
m |
59.556,00 |
Ya |
290 |
Papua Barat |
PPN |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
3 |
m |
75.631,00 |
Ya |
291 |
Jawa Barat |
PPN |
Fasilitas Pokok |
Dermaga (m2) |
150 |
m |
7.128.000,00 |
Ya |
292 |
Maluku |
PPN |
Fasilitas Pokok |
Dermaga (m2) |
150 |
m2 |
8.081.600,00 |
Ya |
293 |
Nusa Tenggara Barat |
PPN |
Fasilitas Pokok |
Lahan (m2) |
100.000 |
m2 |
40.050,00 |
Ya |
294 |
Papua |
PPN |
Fasilitas Pokok |
Dermaga (m2) |
150 |
m2 |
15.096.000,00 |
Ya |
295 |
Lampung |
PPN |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
3 |
m |
56.119,00 |
Ya |
296 |
Maluku |
PPN |
Fasilitas Penunjang |
Rumah Dinas (m2) |
0 |
m2 |
1.686.000.000,00 |
Ya |
297 |
Maluku |
PPN |
Fasilitas Penunjang |
Parkir (m2) |
91 |
m2 |
306.720.000,00 |
Ya |
298 |
Maluku |
PPN |
Fasilitas Penunjang |
Parkir (m2) |
78 |
m2 |
99.500.000,00 |
Ya |
299 |
Maluku |
PPN |
Fasilitas Penunjang |
Tempat Peribadatan (m2) |
0 |
m2 |
65.219.000,00 |
Ya |
300 |
Maluku |
PPN |
Fasilitas Fungsional |
Kantor (m2) |
0 |
m2 |
506.350.000,00 |
Ya |
301 |
Maluku |
PPN |
Fasilitas Fungsional |
Sumur Bor (debit) |
0 |
1 |
31.000.000,00 |
Ya |
302 |
Maluku |
PPN |
Fasilitas Fungsional |
Listrik (kVA) |
105 |
1 |
30.000.000,00 |
Ya |
303 |
Maluku |
PPN |
Fasilitas Fungsional |
Pabrik Es (m2) |
0 |
m2 |
199.000.000,00 |
Ya |
304 |
Maluku |
PPN |
Fasilitas Fungsional |
Water Treatment (unit) |
0 |
unit |
905.755.000,00 |
Ya |
305 |
Gorontalo |
PPI |
Fasilitas Pokok |
Dermaga (m2) |
50 |
m2 |
7.454.400,00 |
Ya |
306 |
Kalimantan Tengah |
PPI |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
1 |
m |
62.681,00 |
Ya |
307 |
Sulawesi Utara |
PPI |
Fasilitas Pokok |
Dermaga (m2) |
10.000 |
m2 |
51.500,00 |
Ya |
308 |
Papua |
PPI |
Fasilitas Pokok |
Lahan (m2) |
10.000 |
m2 |
94.350,00 |
Ya |
309 |
Sumatera Barat |
PPI |
Fasilitas Pokok |
Dermaga (m2) |
50 |
m |
7.097.600,00 |
Ya |
310 |
Gorontalo |
PPI |
Fasilitas Pokok |
Lahan (m2) |
10.000 |
m2 |
46.590,00 |
Ya |
311 |
Sulawesi Selatan |
PPI |
Fasilitas Pokok |
Dermaga (m2) |
50 |
m2 |
6.871.200,00 |
Ya |
312 |
Jambi |
PPI |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
1 |
m |
60.606,00 |
Ya |
313 |
Sulawesi Selatan |
PPI |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
1 |
m |
53.681,00 |
Ya |
314 |
Kalimantan Timur |
PPI |
Fasilitas Pokok |
Dermaga (m2) |
50 |
m2 |
8.000.000,00 |
Ya |
315 |
Papua |
PPI |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
1 |
m |
117.938,00 |
Ya |
316 |
Riau |
PPI |
Fasilitas Pokok |
Lahan (m2) |
10.000 |
m2 |
50.640,00 |
Ya |
317 |
Kalimantan Timur |
PPI |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
1 |
m |
62.500,00 |
Ya |
318 |
Papua Barat |
PPI |
Fasilitas Pokok |
Dermaga (m2) |
50 |
m2 |
9.680.800,00 |
Ya |
319 |
Maluku |
PPI |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
1 |
m |
63.138,00 |
Ya |
320 |
Kalimantan Selatan |
PPI |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
1 |
m |
61.175,00 |
Ya |
321 |
Kalimantan Barat |
PPI |
Fasilitas Pokok |
Dermaga (m2) |
50 |
m2 |
8.590.400,00 |
Ya |
322 |
Lampung |
PPI |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
1 |
m2 |
56.119,00 |
Ya |
323 |
Yogyakarta |
PPI |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
1 |
m |
54.075,00 |
Ya |
324 |
Kalimantan Barat |
PPI |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
1 |
m |
67.113,00 |
Ya |
325 |
Sumatera Selatan |
PPI |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
1 |
m |
59.556,00 |
Ya |
326 |
Jawa Barat |
PPI |
Fasilitas Pokok |
Dermaga (m2) |
50 |
m |
7.128.000,00 |
Ya |
327 |
Maluku |
PPI |
Fasilitas Pokok |
Lahan (m2) |
10.000 |
m2 |
50.510,00 |
Ya |
328 |
Nusa Tenggara Barat |
PPI |
Fasilitas Pokok |
Lahan (m2) |
10.000 |
m2 |
40.050,00 |
Ya |
329 |
Aceh |
PPI |
Fasilitas Pokok |
Alur Pelayaran (m2) |
0 |
m2 |
57.256,00 |
Ya |
330 |
Kalimantan Tengah |
PPI |
Fasilitas Pokok |
Dermaga (m2) |
50 |
m2 |
8.023.200,00 |
Ya |
331 |
Nusa Tenggara Timur |
PPI |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
1 |
m |
54.794,00 |
Ya |
332 |
Sumatera Utara |
PPI |
Fasilitas Pokok |
Dermaga (m2) |
50 |
m |
7.673.600,00 |
Ya |
333 |
Jawa Tengah |
PPI |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
1 |
m |
53.363,00 |
Ya |
334 |
Sulawesi Tengah |
PPI |
Fasilitas Pokok |
Dermaga (m2) |
50 |
m2 |
6.768.000,00 |
Ya |
335 |
Sulawesi Tengah |
PPI |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
1 |
m |
52.875,00 |
Ya |
336 |
Jambi |
PPI |
Fasilitas Pokok |
Lahan (m2) |
10.000 |
m2 |
48.485,00 |
Ya |
337 |
Papua |
PPI |
Fasilitas Pokok |
Alur Pelayaran (m2) |
0 |
m2 |
117.938,00 |
Ya |
338 |
DKI. Jakarta |
PPI |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
1 |
m |
62.500,00 |
Ya |
339 |
Aceh |
PPI |
Fasilitas Pokok |
Dermaga (m2) |
50 |
m2 |
7.328.800,00 |
Ya |
340 |
Sulawesi Tenggara |
PPI |
Fasilitas Pokok |
Lahan (m2) |
10.000 |
m2 |
48.210,00 |
Ya |
341 |
Bengkulu |
PPI |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
1 |
m |
56.119,00 |
Ya |
342 |
Lampung |
PPI |
Fasilitas Pokok |
Lahan (m2) |
10.000 |
m2 |
44.895,00 |
Ya |
343 |
Yogyakarta |
PPI |
Fasilitas Pokok |
Lahan (m2) |
10.000 |
m2 |
43.260,00 |
Ya |
344 |
Kalimantan Utara |
PPI |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
1 |
m |
62.500,00 |
Ya |
345 |
Sumatera Selatan |
PPI |
Fasilitas Pokok |
Lahan (m2) |
10.000 |
m2 |
47.645,00 |
Ya |
346 |
Papua Barat |
PPI |
Fasilitas Pokok |
Lahan (m2) |
10.000 |
m2 |
60.505,00 |
Ya |
347 |
Maluku |
PPI |
Fasilitas Pokok |
Dermaga (m2) |
50 |
m2 |
8.081.600,00 |
Ya |
348 |
Nusa Tenggara Timur |
PPI |
Fasilitas Pokok |
Dermaga (m2) |
50 |
m2 |
7.013.600,00 |
Ya |
349 |
Riau |
PPI |
Fasilitas Pokok |
Dermaga (m2) |
50 |
m |
8.102.400,00 |
Ya |
350 |
Kalimantan Utara |
PPI |
Fasilitas Pokok |
Dermaga (m2) |
50 |
m2 |
8.000.000,00 |
Ya |
351 |
Sulawesi Barat |
PPI |
Fasilitas Pokok |
Lahan (m2) |
10.000 |
m2 |
45.980,00 |
Ya |
352 |
Kep. Riau |
PPI |
Fasilitas Pokok |
Lahan (m2) |
10.000 |
m2 |
54.710,00 |
Ya |
353 |
Kep. Riau |
PPI |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
1 |
m |
68.388,00 |
Ya |
354 |
Sumatera Utara |
PPI |
Fasilitas Pokok |
Lahan (m2) |
10.000 |
m2 |
47.960,00 |
Ya |
355 |
Sulawesi Utara |
PPI |
Fasilitas Pokok |
Dermaga (m2) |
50 |
m2 |
8.240.000,00 |
Ya |
356 |
Jawa Tengah |
PPI |
Fasilitas Pokok |
Lahan (m2) |
10.000 |
m2 |
42.690,00 |
Ya |
357 |
Sulawesi Utara |
PPI |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
1 |
m |
64.375,00 |
Ya |
358 |
Jawa Barat |
PPI |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
1 |
m |
55.688,00 |
Ya |
359 |
Sulawesi Selatan |
PPI |
Fasilitas Pokok |
Lahan (m2) |
10.000 |
m2 |
42.945,00 |
Ya |
360 |
|
PPI |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
15.000 |
m3 |
100.000,00 |
Ya |
361 |
Kalimantan Selatan |
PPI |
Fasilitas Pokok |
Dermaga (m2) |
50 |
m2 |
7.830.400,00 |
Ya |
362 |
DKI. Jakarta |
PPI |
Fasilitas Pokok |
Lahan (m2) |
10.000 |
m2 |
50.000,00 |
Ya |
363 |
Kalimantan Timur |
PPI |
Fasilitas Pokok |
Lahan (m2) |
100.000 |
m2 |
50.000,00 |
Ya |
364 |
Kep. Bangka Belitung |
PPI |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
1 |
m |
62.244,00 |
Ya |
365 |
Sumatera Utara |
PPI |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
1 |
m |
59.950,00 |
Ya |
366 |
Kalimantan Barat |
PPI |
Fasilitas Pokok |
Lahan (m2) |
10.000 |
m2 |
53.690,00 |
Ya |
367 |
Maluku Utara |
PPI |
Fasilitas Pokok |
Dermaga (m2) |
50 |
m2 |
9.209.600,00 |
Ya |
368 |
Sumatera Barat |
PPI |
Fasilitas Pokok |
Lahan (m2) |
10.000 |
m2 |
44.360,00 |
Ya |
369 |
|
PPI |
Fasilitas Pokok |
Lahan (m2) |
10.000 |
m2 |
1.000.000,00 |
Ya |
370 |
Jambi |
PPI |
Fasilitas Pokok |
Dermaga (m2) |
50 |
m |
7.757.600,00 |
Ya |
371 |
Maluku Utara |
PPI |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
1 |
m |
71.950,00 |
Ya |
372 |
Nusa Tenggara Barat |
PPI |
Fasilitas Pokok |
Dermaga (m2) |
50 |
m2 |
6.408.000,00 |
Ya |
373 |
Nusa Tenggara Barat |
PPI |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
1 |
m |
50.063,00 |
Ya |
374 |
Nusa Tenggara Timur |
PPI |
Fasilitas Pokok |
Lahan (m2) |
10.000 |
m2 |
43.835,00 |
Ya |
375 |
Lampung |
PPI |
Fasilitas Pokok |
Dermaga (m2) |
50 |
m2 |
7.183.200,00 |
Ya |
376 |
Yogyakarta |
PPI |
Fasilitas Pokok |
Dermaga (m2) |
50 |
m |
6.921.600,00 |
Ya |
377 |
Kalimantan Tengah |
PPI |
Fasilitas Pokok |
Lahan (m2) |
10.000 |
m2 |
50.145,00 |
Ya |
378 |
Gorontalo |
PPI |
Fasilitas Pokok |
Dermaga (m2) |
372.720.000 |
50 |
7.454.400,00 |
Ya |
379 |
Papua Barat |
PPI |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
1 |
m |
75.631,00 |
Ya |
380 |
Sumatera Selatan |
PPI |
Fasilitas Pokok |
Dermaga (m2) |
50 |
m |
7.623.200,00 |
Ya |
381 |
Sulawesi Tengah |
PPI |
Fasilitas Pokok |
Lahan (m2) |
10.000 |
m2 |
42.300,00 |
Ya |
382 |
Sumatera Barat |
PPI |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
1 |
m |
55.450,00 |
Ya |
383 |
Jawa Barat |
PPI |
Fasilitas Pokok |
Lahan (m2) |
10.000 |
m2 |
44.550,00 |
Ya |
384 |
Sulawesi Tenggara |
PPI |
Fasilitas Pokok |
Dermaga (m2) |
50 |
m2 |
7.713.600,00 |
Ya |
385 |
Papua |
PPI |
Fasilitas Pokok |
Dermaga (m2) |
50 |
m2 |
15.096.000,00 |
Ya |
386 |
Bengkulu |
PPI |
Fasilitas Pokok |
Lahan (m2) |
10.000 |
m2 |
44.895,00 |
Ya |
387 |
Riau |
PPI |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
1 |
m |
63.300,00 |
Ya |
388 |
Aceh |
PPI |
Fasilitas Pokok |
Lahan (m2) |
10.000 |
m2 |
45.805,00 |
Ya |
389 |
Sulawesi Tenggara |
PPI |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
1 |
m |
60.263,00 |
Ya |
390 |
Kep. Riau |
PPI |
Fasilitas Pokok |
Dermaga (m2) |
50 |
m |
8.753.600,00 |
Ya |
391 |
Kep. Bangka Belitung |
PPI |
Fasilitas Pokok |
Lahan (m2) |
10.000 |
m2 |
49.795,00 |
Ya |
392 |
Sulawesi Barat |
PPI |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
1 |
m |
57.475,00 |
Ya |
393 |
Kep. Bangka Belitung |
PPI |
Fasilitas Pokok |
Dermaga (m2) |
50 |
m |
7.967.200,00 |
Ya |
394 |
Aceh |
PPI |
Fasilitas Pokok |
Jalan Komplek (m) |
0 |
|
0,00 |
Ya |
395 |
Jawa Tengah |
PPI |
Fasilitas Pokok |
Dermaga (m2) |
50 |
m |
6.830.400,00 |
Ya |
396 |
Maluku Utara |
PPI |
Fasilitas Pokok |
Lahan (m2) |
10.000 |
m2 |
57.560,00 |
Ya |
397 |
Gorontalo |
PPI |
Fasilitas Pokok |
Kolam Pelabuhan (m3) |
1 |
m |
58.238,00 |
Ya |
398 |
|
PPI |
Fasilitas Pokok |
Drainase (m) |
1.000 |
m |
350.000,00 |
Ya |
399 |
DKI. Jakarta |
PPI |
Fasilitas Pokok |
Dermaga (m2) |
50 |
m |
8.000.000,00 |
Ya |
400 |
Sulawesi Barat |
PPI |
Fasilitas Pokok |
Dermaga (m2) |
50 |
m2 |
7.356.800,00 |
Ya |
401 |
Bengkulu |
PPI |
Fasilitas Pokok |
Dermaga (m2) |
50 |
m |
7.183.200,00 |
Ya |
402 |
Kalimantan Selatan |
PPI |
Fasilitas Pokok |
Lahan (m2) |
10.000 |
m2 |
48.940,00 |
Ya |
403 |
Kalimantan Utara |
PPI |
Fasilitas Pokok |
Lahan (m2) |
10.000 |
m2 |
50.000,00 |
Ya |
404 |
|
PPI |
Fasilitas Penunjang |
Pos Jaga (unit) |
6 |
m2 |
3.500.000,00 |
Ya |
405 |
|
PPI |
Fasilitas Penunjang |
MCK (unit) |
10 |
m2 |
3.500.000,00 |
Ya |
406 |
|
PPI |
Fasilitas Fungsional |
TPI (m) |
250 |
m2 |
3.000.000,00 |
Ya |
407 |
Nusa Tenggara Barat |
PPI |
Fasilitas Fungsional |
Listrik (kVA) |
10.000.000 |
2200 WATT |
10.000.000,00 |
Ya |
408 |
|
PPI |
Fasilitas Fungsional |
Kantor (m2) |
200 |
m2 |
3.500.000,00 |
Ya |
409 |
Aceh |
PPI |
Fasilitas Fungsional |
Kantor (m2) |
0 |
m2 |
425.000.000,00 |
Ya |
410 |
Kalimantan Barat |
PP |
Fasilitas Pokok |
Revetment (m2) |
0 |
m2 |
8.590.400,00 |
Ya |
411 |
Aceh |
PP |
Fasilitas Pokok |
Groin (m2) |
0 |
m2 |
7.328.800,00 |
Ya |
412 |
Sumatera Selatan |
PP |
Fasilitas Pokok |
Trestle (m2) |
0 |
m2 |
7.623.200,00 |
Ya |
413 |
Jawa Tengah |
PP |
Fasilitas Pokok |
Pager (m2) |
0 |
m2 |
5.122.800,00 |
Ya |
414 |
Sulawesi Utara |
PP |
Fasilitas Pokok |
Groin (m2) |
0 |
m2 |
8.240.000,00 |
Ya |
415 |
Kalimantan Selatan |
PP |
Fasilitas Pokok |
Alur Pelayaran (m2) |
0 |
m2 |
61.175,00 |
Ya |
416 |
Maluku |
PP |
Fasilitas Pokok |
Drainase (m) |
0 |
m |
505.100,00 |
Ya |
417 |
Sumatera Selatan |
PP |
Fasilitas Pokok |
Lahan (m2) |
200.000 |
m2 |
47.645,00 |
Ya |
418 |
Sulawesi Barat |
PP |
Fasilitas Pokok |
Jalan Komplek (m) |
0 |
m2 |
565.554,00 |
Ya |
419 |
Jawa Barat |
PP |
Fasilitas Pokok |
Alur Pelayaran (m2) |
0 |
m2 |
55.688,00 |
Ya |
420 |
Gorontalo |
PP |
Fasilitas Pokok |
Groin (m2) |
0 |
m2 |
7.454.400,00 |
Ya |
421 |
Sulawesi Tengah |
PP |
Fasilitas Pokok |
Jembatan (m2) |
0 |
m2 |
6.768.000,00 |
Ya |
422 |
Kalimantan Tengah |
PP |
Fasilitas Pokok |
Alur Pelayaran (m2) |
0 |
m2 |
62.681,00 |
Ya |
423 |
Jambi |
PP |
Fasilitas Pokok |
Jalan Komplek (m) |
0 |
m2 |
596.366,00 |
Ya |
424 |
Sulawesi Utara |
PP |
Fasilitas Pokok |
Alur Pelayaran (m2) |
0 |
m2 |
64.375,00 |
Ya |
425 |
Bengkulu |
PP |
Fasilitas Pokok |
Trestle (m2) |
0 |
m2 |
7.183.200,00 |
Ya |
426 |
Kep. Riau |
PP |
Fasilitas Pokok |
Alur Pelayaran (m2) |
0 |
m2 |
68.388,00 |
Ya |
427 |
Riau |
PP |
Fasilitas Pokok |
Jetty (m2) |
0 |
m2 |
8.102.400,00 |
Ya |
428 |
Sulawesi Selatan |
PP |
Fasilitas Pokok |
Jalan Komplek (m) |
0 |
m2 |
528.224,00 |
Ya |
429 |
Maluku Utara |
PP |
Fasilitas Pokok |
Jembatan (m2) |
0 |
m2 |
9.209.600,00 |
Ya |
430 |
Kep. Riau |
PP |
Fasilitas Pokok |
Groin (m2) |
0 |
m2 |
8.753.600,00 |
Ya |
431 |
DKI. Jakarta |
PP |
Fasilitas Pokok |
Pager (m2) |
0 |
m2 |
6.000.000,00 |
Ya |
432 |
Riau |
PP |
Fasilitas Pokok |
Pager (m2) |
0 |
m2 |
6.076.800,00 |
Ya |
433 |
Kalimantan Timur |
PP |
Fasilitas Pokok |
Jalan Komplek (m) |
0 |
m2 |
615.000,00 |
Ya |
434 |
Nusa Tenggara Barat |
PP |
Fasilitas Pokok |
Drainase (m) |
0 |
m |
400.500,00 |
Ya |
435 |
Kalimantan Selatan |
PP |
Fasilitas Pokok |
Trestle (m2) |
0 |
m2 |
7.830.400,00 |
Ya |
436 |
Nusa Tenggara Timur |
PP |
Fasilitas Pokok |
Breakwater (m2) |
0 |
m2 |
131.505.000,00 |
Ya |
437 |
Sumatera Utara |
PP |
Fasilitas Pokok |
Jalan Komplek (m) |
0 |
m |
589.908,00 |
Ya |
438 |
Lampung |
PP |
Fasilitas Pokok |
Trestle (m2) |
0 |
m2 |
7.183.200,00 |
Ya |
439 |
Yogyakarta |
PP |
Fasilitas Pokok |
Alur Pelayaran (m2) |
0 |
m2 |
54.075,00 |
Ya |
440 |
Sulawesi Tenggara |
PP |
Fasilitas Pokok |
Trestle (m2) |
0 |
m2 |
7.713.600,00 |
Ya |
441 |
Kalimantan Utara |
PP |
Fasilitas Pokok |
Breakwater (m2) |
0 |
m2 |
150.000.000,00 |
Ya |
442 |
Kalimantan Tengah |
PP |
Fasilitas Pokok |
Jalan Komplek (m) |
0 |
m2 |
616.784,00 |
Ya |
443 |
Sumatera Barat |
PP |
Fasilitas Pokok |
Breakwater (m2) |
0 |
m2 |
133.080.000,00 |
Ya |
444 |
Nusa Tenggara Timur |
PP |
Fasilitas Pokok |
Jetty (m2) |
0 |
m2 |
7.013.600,00 |
Ya |
445 |
Sumatera Utara |
PP |
Fasilitas Pokok |
Alur Pelayaran (m2) |
0 |
m2 |
59.950,00 |
Ya |
446 |
Aceh |
PP |
Fasilitas Pokok |
Trestle (m2) |
0 |
m2 |
7.328.800,00 |
Ya |
447 |
Kalimantan Utara |
PP |
Fasilitas Pokok |
Jetty (m2) |
0 |
m2 |
8.000.000,00 |
Ya |
448 |
Kalimantan Tengah |
PP |
Fasilitas Pokok |
Groin (m2) |
0 |
m2 |
8.023.200,00 |
Ya |
449 |
Sumatera Selatan |
PP |
Fasilitas Pokok |
Jalan Komplek (m) |
0 |
m2 |
586.034,00 |
Ya |
450 |
Kep. Bangka Belitung |
PP |
Fasilitas Pokok |
Breakwater (m2) |
0 |
m2 |
149.385.000,00 |
Ya |
451 |
Sumatera Barat |
PP |
Fasilitas Pokok |
Groin (m2) |
0 |
m2 |
7.097.600,00 |
Ya |
452 |
Sulawesi Barat |
PP |
Fasilitas Pokok |
Revetment (m2) |
0 |
m2 |
7.356.800,00 |
Ya |
453 |
Sulawesi Utara |
PP |
Fasilitas Pokok |
Jetty (m2) |
0 |
m2 |
8.240.000,00 |
Ya |
454 |
Nusa Tenggara Timur |
PP |
Fasilitas Pokok |
Alur Pelayaran (m2) |
0 |
m2 |
54.794,00 |
Ya |
455 |
Maluku |
PP |
Fasilitas Pokok |
Pager (m2) |
0 |
m2 |
6.061.200,00 |
Ya |
456 |
Maluku |
PP |
Fasilitas Pokok |
Dermaga (m2) |
0 |
|
0,00 |
Ya |
457 |
Kep. Bangka Belitung |
PP |
Fasilitas Pokok |
Jetty (m2) |
0 |
m2 |
7.967.200,00 |
Ya |
458 |
Papua |
PP |
Fasilitas Pokok |
Trestle (m2) |
0 |
m2 |
15.096.000,00 |
Ya |
459 |
Jambi |
PP |
Fasilitas Pokok |
Breakwater (m2) |
0 |
m2 |
145.455.000,00 |
Ya |
460 |
Jawa Barat |
PP |
Fasilitas Pokok |
Pager (m2) |
0 |
m2 |
5.346.000,00 |
Ya |
461 |
Maluku |
PP |
Fasilitas Pokok |
Jetty (m2) |
0 |
m2 |
8.081.600,00 |
Ya |
462 |
Gorontalo |
PP |
Fasilitas Pokok |
Drainase (m) |
0 |
m |
465.900,00 |
Ya |
463 |
Sulawesi Tengah |
PP |
Fasilitas Pokok |
Revetment (m2) |
0 |
m2 |
6.768.000,00 |
Ya |
464 |
Kep. Bangka Belitung |
PP |
Fasilitas Pokok |
Pager (m2) |
0 |
m2 |
5.975.400,00 |
Ya |
465 |
Maluku Utara |
PP |
Fasilitas Pokok |
Revetment (m2) |
0 |
m2 |
9.209.600,00 |
Ya |
466 |
Jambi |
PP |
Fasilitas Pokok |
Jembatan (m2) |
0 |
m2 |
7.757.600,00 |
Ya |
467 |
Bengkulu |
PP |
Fasilitas Pokok |
Jalan Komplek (m) |
0 |
m2 |
552.209,00 |
Ya |
468 |
Kep. Riau |
PP |
Fasilitas Pokok |
Drainase (m) |
0 |
m2 |
547.100,00 |
Ya |
469 |
DKI. Jakarta |
PP |
Fasilitas Pokok |
Trestle (m2) |
0 |
m2 |
8.000.000,00 |
Ya |
470 |
Sulawesi Selatan |
PP |
Fasilitas Pokok |
Jembatan (m2) |
0 |
m2 |
6.871.200,00 |
Ya |
471 |
Papua Barat |
PP |
Fasilitas Pokok |
Drainase (m) |
0 |
m |
605.050,00 |
Ya |
472 |
Kalimantan Selatan |
PP |
Fasilitas Pokok |
Jembatan (m2) |
0 |
m2 |
7.830.400,00 |
Ya |
473 |
Kalimantan Timur |
PP |
Fasilitas Pokok |
Jembatan (m2) |
0 |
m2 |
8.000.000,00 |
Ya |
474 |
Sulawesi Tenggara |
PP |
Fasilitas Pokok |
Drainase (m) |
0 |
m |
482.100,00 |
Ya |
475 |
Nusa Tenggara Barat |
PP |
Fasilitas Pokok |
Groin (m2) |
0 |
m2 |
6.408.000,00 |
Ya |
476 |
Nusa Tenggara Timur |
PP |
Fasilitas Pokok |
Pager (m2) |
0 |
m2 |
5.260.200,00 |
Ya |
477 |
Sumatera Utara |
PP |
Fasilitas Pokok |
Jembatan (m2) |
0 |
m2 |
7.673.600,00 |
Ya |
478 |
Papua |
PP |
Fasilitas Pokok |
Jembatan (m2) |
0 |
m2 |
15.096.000,00 |
Ya |
479 |
Lampung |
PP |
Fasilitas Pokok |
Lahan (m2) |
0 |
m2 |
552.209,00 |
Ya |
480 |
Yogyakarta |
PP |
Fasilitas Pokok |
Pager (m2) |
0 |
m2 |
5.191.200,00 |
Ya |
481 |
Kalimantan Utara |
PP |
Fasilitas Pokok |
Pager (m2) |
0 |
m2 |
6.000.000,00 |
Ya |
482 |
Sumatera Barat |
PP |
Fasilitas Pokok |
Revetment (m2) |
0 |
m2 |
7.097.600,00 |
Ya |
483 |
Kalimantan Barat |
PP |
Fasilitas Pokok |
Jalan Komplek (m) |
0 |
m2 |
660.387,00 |
Ya |
484 |
Nusa Tenggara Barat |
PP |
Fasilitas Pokok |
Alur Pelayaran (m2) |
0 |
m2 |
50.063,00 |
Ya |
485 |
Sumatera Barat |
PP |
Fasilitas Pokok |
Alur Pelayaran (m2) |
0 |
m2 |
55.450,00 |
Ya |
486 |
Jawa Tengah |
PP |
Fasilitas Pokok |
Trestle (m2) |
0 |
m2 |
6.830.400,00 |
Ya |
487 |
Sulawesi Utara |
PP |
Fasilitas Pokok |
Jalan Komplek (m) |
0 |
m2 |
633.450,00 |
Ya |
488 |
Jawa Tengah |
PP |
Fasilitas Pokok |
Jalan Komplek (m) |
0 |
m2 |
525.087,00 |
Ya |
489 |
Sulawesi Utara |
PP |
Fasilitas Pokok |
Jembatan (m2) |
0 |
m2 |
8.240.000,00 |
Ya |
490 |
Sumatera Selatan |
PP |
Fasilitas Pokok |
Jembatan (m2) |
0 |
m2 |
7.623.200,00 |
Ya |
491 |
Sulawesi Barat |
PP |
Fasilitas Pokok |
Jembatan (m2) |
0 |
m2 |
7.356.800,00 |
Ya |
492 |
Jawa Barat |
PP |
Fasilitas Pokok |
Trestle (m2) |
0 |
m2 |
7.128.000,00 |
Ya |
493 |
Gorontalo |
PP |
Fasilitas Pokok |
Jetty (m2) |
0 |
m2 |
7.454.400,00 |
Ya |
494 |
Sulawesi Tengah |
PP |
Fasilitas Pokok |
Drainase (m) |
0 |
m2 |
423.000,00 |
Ya |
495 |
Kep. Riau |
PP |
Fasilitas Pokok |
Breakwater (m2) |
0 |
m2 |
164.130.000,00 |
Ya |
496 |
Maluku Utara |
PP |
Fasilitas Pokok |
Drainase (m) |
0 |
m |
575.600,00 |
Ya |
497 |
Jambi |
PP |
Fasilitas Pokok |
Jetty (m2) |
0 |
m2 |
7.757.600,00 |
Ya |
498 |
Bengkulu |
PP |
Fasilitas Pokok |
Breakwater (m2) |
0 |
m2 |
134.685.000,00 |
Ya |
499 |
Kep. Riau |
PP |
Fasilitas Pokok |
Jetty (m2) |
0 |
m2 |
8.753.600,00 |
Ya |
500 |
Riau |
PP |
Fasilitas Pokok |
Revetment (m2) |
0 |
m2 |
8.102.400,00 |
Ya |
501 |
Maluku Utara |
PP |
Fasilitas Pokok |
Alur Pelayaran (m2) |
0 |
m2 |
71.950,00 |
Ya |
502 |
Papua Barat |
PP |
Fasilitas Pokok |
Jetty (m2) |
0 |
m2 |
9.680.800,00 |
Ya |
503 |
Bengkulu |
PP |
Fasilitas Pokok |
Jembatan (m2) |
0 |
m2 |
7.183.200,00 |
Ya |
504 |
Kalimantan Selatan |
PP |
Fasilitas Pokok |
Jalan Komplek (m) |
0 |
m2 |
601.962,00 |
Ya |
505 |
DKI. Jakarta |
PP |
Fasilitas Pokok |
Jalan Komplek (m) |
0 |
m2 |
615.000,00 |
Ya |
506 |
Riau |
PP |
Fasilitas Pokok |
Drainase (m) |
0 |
m2 |
506.400,00 |
Ya |
507 |
Sulawesi Selatan |
PP |
Fasilitas Pokok |
Trestle (m2) |
0 |
m2 |
6.871.200,00 |
Ya |
508 |
Nusa Tenggara Barat |
PP |
Fasilitas Pokok |
Breakwater (m2) |
0 |
m2 |
120.150.000,00 |
Ya |
509 |
Kalimantan Selatan |
PP |
Fasilitas Pokok |
Revetment (m2) |
0 |
m2 |
7.830.400,00 |
Ya |
510 |
Sumatera Utara |
PP |
Fasilitas Pokok |
Trestle (m2) |
0 |
m2 |
7.673.600,00 |
Ya |
511 |
Kalimantan Timur |
PP |
Fasilitas Pokok |
Trestle (m2) |
0 |
m2 |
8.000.000,00 |
Ya |
512 |
Lampung |
PP |
Fasilitas Pokok |
Breakwater (m2) |
0 |
m2 |
134.685.000,00 |
Ya |
513 |
Yogyakarta |
PP |
Fasilitas Pokok |
Trestle (m2) |
0 |
m2 |
6.921.600,00 |
Ya |
514 |
Sulawesi Tenggara |
PP |
Fasilitas Pokok |
Groin (m2) |
0 |
m2 |
7.713.600,00 |
Ya |
515 |
Kalimantan Tengah |
PP |
Fasilitas Pokok |
Breakwater (m2) |
0 |
m2 |
150.435.000,00 |
Ya |
516 |
Nusa Tenggara Barat |
PP |
Fasilitas Pokok |
Jetty (m2) |
0 |
m2 |
6.408.000,00 |
Ya |
517 |
Nusa Tenggara Timur |
PP |
Fasilitas Pokok |
Revetment (m2) |
0 |
m2 |
7.013.600,00 |
Ya |
518 |
Lampung |
PP |
Fasilitas Pokok |
Jembatan (m2) |
0 |
m2 |
7.183.200,00 |
Ya |
519 |
Yogyakarta |
PP |
Fasilitas Pokok |
Lahan (m2) |
200.000 |
m2 |
43.260,00 |
Ya |
520 |
Kalimantan Utara |
PP |
Fasilitas Pokok |
Revetment (m2) |
0 |
m2 |
8.000.000,00 |
Ya |
521 |
Kalimantan Tengah |
PP |
Fasilitas Pokok |
Jembatan (m2) |
0 |
m2 |
8.023.200,00 |
Ya |
522 |
Papua |
PP |
Fasilitas Pokok |
Groin (m2) |
0 |
m2 |
15.096.000,00 |
Ya |
523 |
Kalimantan Barat |
PP |
Fasilitas Pokok |
Jembatan (m2) |
0 |
m2 |
8.590.400,00 |
Ya |
524 |
Aceh |
PP |
Fasilitas Pokok |
Pager (m2) |
0 |
m2 |
5.496.600,00 |
Ya |
525 |
Sumatera Selatan |
PP |
Fasilitas Pokok |
Breakwater (m2) |
0 |
m2 |
142.935.000,00 |
Ya |
526 |
Sulawesi Tenggara |
PP |
Fasilitas Pokok |
Alur Pelayaran (m2) |
0 |
m2 |
60.263,00 |
Ya |
527 |
Kalimantan Barat |
PP |
Fasilitas Pokok |
Trestle (m2) |
0 |
m2 |
8.590.400,00 |
Ya |
528 |
Sumatera Selatan |
PP |
Fasilitas Pokok |
Jetty (m2) |
0 |
m2 |
7.623.200,00 |
Ya |
529 |
Sumatera Barat |
PP |
Fasilitas Pokok |
Jembatan (m2) |
0 |
m2 |
7.097.600,00 |
Ya |
530 |
Jawa Tengah |
PP |
Fasilitas Pokok |
Jembatan (m2) |
0 |
m2 |
6.830.400,00 |
Ya |
531 |
Sulawesi Barat |
PP |
Fasilitas Pokok |
Alur Pelayaran (m2) |
0 |
m2 |
57.475,00 |
Ya |
532 |
Sulawesi Utara |
PP |
Fasilitas Pokok |
Revetment (m2) |
0 |
m2 |
8.240.000,00 |
Ya |
533 |
Kep. Riau |
PP |
Fasilitas Pokok |
Dermaga (m2) |
20 |
4000 |
4.000,00 |
Ya |
534 |
Kep. Bangka Belitung |
PP |
Fasilitas Pokok |
Trestle (m2) |
0 |
m2 |
7.967.200,00 |
Ya |
535 |
Sulawesi Barat |
PP |
Fasilitas Pokok |
Drainase (m) |
0 |
m |
459.800,00 |
Ya |
536 |
Jawa Barat |
PP |
Fasilitas Pokok |
Jalan Komplek (m) |
0 |
m2 |
547.965,00 |
Ya |
537 |
Maluku |
PP |
Fasilitas Pokok |
Revetment (m2) |
0 |
m2 |
8.081.600,00 |
Ya |
538 |
Sulawesi Barat |
PP |
Fasilitas Pokok |
Pager (m2) |
0 |
m2 |
5.590.800,00 |
Ya |
539 |
Sulawesi Tengah |
PP |
Fasilitas Pokok |
Groin (m2) |
0 |
m2 |
6.768.000,00 |
Ya |
540 |
Kep. Riau |
PP |
Fasilitas Pokok |
Revetment (m2) |
0 |
m2 |
8.753.600,00 |
Ya |
541 |
Kep. Bangka Belitung |
PP |
Fasilitas Pokok |
Drainase (m) |
0 |
m2 |
497.950,00 |
Ya |
542 |
Papua Barat |
PP |
Fasilitas Pokok |
Revetment (m2) |
0 |
m2 |
9.680.800,00 |
Ya |
543 |
Jambi |
PP |
Fasilitas Pokok |
Drainase (m) |
0 |
m2 |
484.850,00 |
Ya |
544 |
Bengkulu |
PP |
Fasilitas Pokok |
Jetty (m2) |
0 |
m2 |
7.183.200,00 |
Ya |
545 |
DKI. Jakarta |
PP |
Fasilitas Pokok |
Breakwater (m2) |
0 |
m2 |
150.000.000,00 |
Ya |
546 |
Sulawesi Selatan |
PP |
Fasilitas Pokok |
Drainase (m) |
0 |
m |
429.450,00 |
Ya |
547 |
Maluku Utara |
PP |
Fasilitas Pokok |
Groin (m2) |
0 |
m2 |
9.209.600,00 |
Ya |
548 |
Papua Barat |
PP |
Fasilitas Pokok |
Jalan Komplek (m) |
0 |
m2 |
744.212,00 |
Ya |
549 |
Kalimantan Selatan |
PP |
Fasilitas Pokok |
Drainase (m) |
0 |
m |
489.400,00 |
Ya |
550 |
DKI. Jakarta |
PP |
Fasilitas Pokok |
Jembatan (m2) |
0 |
m2 |
8.000.000,00 |
Ya |
551 |
Riau |
PP |
Fasilitas Pokok |
Jembatan (m2) |
0 |
m2 |
8.102.400,00 |
Ya |
552 |
Kalimantan Timur |
PP |
Fasilitas Pokok |
Drainase (m) |
0 |
m |
500.000,00 |
Ya |
553 |
Papua Barat |
PP |
Fasilitas Pokok |
Groin (m2) |
0 |
m2 |
9.680.800,00 |
Ya |
554 |
Sulawesi Tenggara |
PP |
Fasilitas Pokok |
Breakwater (m2) |
0 |
m2 |
144.630.000,00 |
Ya |
555 |
Nusa Tenggara Barat |
PP |
Fasilitas Pokok |
Pager (m2) |
0 |
m2 |
4.806.000,00 |
Ya |
556 |
Nusa Tenggara Timur |
PP |
Fasilitas Pokok |
Jalan Komplek (m) |
0 |
m2 |
539.171,00 |
Ya |
557 |
Sumatera Utara |
PP |
Fasilitas Pokok |
Drainase (m) |
0 |
m2 |
479.600,00 |
Ya |
558 |
Papua |
PP |
Fasilitas Pokok |
Drainase (m) |
0 |
m |
943.500,00 |
Ya |
559 |
Lampung |
PP |
Fasilitas Pokok |
Jetty (m2) |
0 |
m2 |
7.183.200,00 |
Ya |
560 |
Yogyakarta |
PP |
Fasilitas Pokok |
Jalan Komplek (m) |
0 |
m2 |
532.098,00 |
Ya |
561 |
Gorontalo |
PP |
Fasilitas Pokok |
Jetty (m2) |
0 |
m2 |
7.713.600,00 |
Ya |
562 |
Kalimantan Utara |
PP |
Fasilitas Pokok |
Jalan Komplek (m) |
0 |
m2 |
615.000,00 |
Ya |
563 |
Aceh |
PP |
Fasilitas Pokok |
Jetty (m2) |
0 |
m2 |
7.328.800,00 |
Ya |
564 |
Maluku Utara |
PP |
Fasilitas Pokok |
Breakwater (m2) |
0 |
m3 |
172.680.000,00 |
Ya |
565 |
Jawa Tengah |
PP |
Fasilitas Pokok |
Breakwater (m2) |
0 |
m2 |
128.070.000,00 |
Ya |
566 |
Sulawesi Utara |
PP |
Fasilitas Pokok |
Drainase (m) |
0 |
m |
515.000,00 |
Ya |
567 |
Maluku |
PP |
Fasilitas Pokok |
Breakwater (m2) |
0 |
m2 |
151.530.000,00 |
Ya |
568 |
Sumatera Selatan |
PP |
Fasilitas Pokok |
Drainase (m) |
0 |
m2 |
476.450,00 |
Ya |
569 |
Sulawesi Barat |
PP |
Fasilitas Pokok |
Trestle (m2) |
0 |
m2 |
7.356.800,00 |
Ya |
570 |
Jawa Barat |
PP |
Fasilitas Pokok |
Breakwater (m2) |
0 |
m2 |
133.650.000,00 |
Ya |
571 |
Gorontalo |
PP |
Fasilitas Pokok |
Trestle (m2) |
0 |
m2 |
7.454.400,00 |
Ya |
572 |
Sulawesi Tengah |
PP |
Fasilitas Pokok |
Breakwater (m2) |
0 |
m2 |
126.900.000,00 |
Ya |
573 |
Jambi |
PP |
Fasilitas Pokok |
Revetment (m2) |
0 |
m2 |
7.757.600,00 |
Ya |
574 |
Jawa Barat |
PP |
Fasilitas Pokok |
Jembatan (m2) |
0 |
m2 |
7.128.000,00 |
Ya |
575 |
Gorontalo |
PP |
Fasilitas Pokok |
Jalan Komplek (m) |
0 |
m2 |
573.057,00 |
Ya |
576 |
Sulawesi Tengah |
PP |
Fasilitas Pokok |
Trestle (m2) |
0 |
m2 |
6.768.000,00 |
Ya |
577 |
Kep. Riau |
PP |
Fasilitas Pokok |
Trestle (m2) |
0 |
m2 |
8.753.600,00 |
Ya |
578 |
Maluku Utara |
PP |
Fasilitas Pokok |
Jetty (m2) |
0 |
m2 |
9.209.600,00 |
Ya |
579 |
Papua Barat |
PP |
Fasilitas Pokok |
Trestle (m2) |
0 |
m2 |
9.680.800,00 |
Ya |
580 |
Jambi |
PP |
Fasilitas Pokok |
Groin (m2) |
0 |
m2 |
7.757.600,00 |
Ya |
581 |
Bengkulu |
PP |
Fasilitas Pokok |
Drainase (m) |
0 |
m2 |
448.950,00 |
Ya |
582 |
Kep. Riau |
PP |
Fasilitas Pokok |
Pager (m2) |
0 |
m2 |
6.565.200,00 |
Ya |
583 |
DKI. Jakarta |
PP |
Fasilitas Pokok |
Jetty (m2) |
0 |
m2 |
8.000.000,00 |
Ya |
584 |
Riau |
PP |
Fasilitas Pokok |
Jalan Komplek (m) |
0 |
m2 |
622.872,00 |
Ya |
585 |
Maluku |
PP |
Fasilitas Pokok |
Dermaga (m2) |
9.999.999.999 |
paket |
150.000.000.000,00 |
Tidak |
586 |
Sulawesi Selatan |
PP |
Fasilitas Pokok |
Groin (m2) |
0 |
m2 |
6.871.200,00 |
Ya |
587 |
Gorontalo |
PP |
Fasilitas Pokok |
Alur Pelayaran (m2) |
0 |
m2 |
58.238,00 |
Ya |
588 |
Sumatera Utara |
PP |
Fasilitas Pokok |
Breakwater (m2) |
0 |
m2 |
143.880.000,00 |
Ya |
589 |
Kalimantan Timur |
PP |
Fasilitas Pokok |
Groin (m2) |
0 |
m2 |
8.000.000,00 |
Ya |
590 |
Yogyakarta |
PP |
Fasilitas Pokok |
Breakwater (m2) |
0 |
m2 |
129.780.000,00 |
Ya |
591 |
Sulawesi Tenggara |
PP |
Fasilitas Pokok |
Pager (m2) |
0 |
m2 |
5.785.200,00 |
Ya |
592 |
Nusa Tenggara Barat |
PP |
Fasilitas Pokok |
Revetment (m2) |
0 |
m2 |
6.408.000,00 |
Ya |
593 |
Nusa Tenggara Timur |
PP |
Fasilitas Pokok |
Jembatan (m2) |
0 |
m2 |
7.013.600,00 |
Ya |
594 |
Sumatera Utara |
PP |
Fasilitas Pokok |
Groin (m2) |
0 |
m2 |
7.673.600,00 |
Ya |
595 |
Sulawesi Selatan |
PP |
Fasilitas Pokok |
Alur Pelayaran (m2) |
0 |
m2 |
53.681,00 |
Ya |
596 |
Maluku |
PP |
Fasilitas Pokok |
Drainase (m) |
0 |
m2 |
448.950,00 |
Ya |
597 |
Yogyakarta |
PP |
Fasilitas Pokok |
Jembatan (m2) |
0 |
m2 |
6.921.600,00 |
Ya |
598 |
Kalimantan Utara |
PP |
Fasilitas Pokok |
Jembatan (m2) |
0 |
m2 |
8.000.000,00 |
Ya |
599 |
Kalimantan Tengah |
PP |
Fasilitas Pokok |
Pager (m2) |
0 |
m2 |
6.017.400,00 |
Ya |
600 |
Papua |
PP |
Fasilitas Pokok |
Revetment (m2) |
0 |
m2 |
15.096.000,00 |
Ya |
601 |
Kalimantan Timur |
PP |
Fasilitas Pokok |
Alur Pelayaran (m2) |
0 |
m2 |
62.500,00 |
Ya |
602 |
Kalimantan Barat |
PP |
Fasilitas Pokok |
Drainase (m) |
0 |
m |
536.900,00 |
Ya |
603 |
Aceh |
PP |
Fasilitas Pokok |
Jalan Komplek (m) |
0 |
m2 |
563.402,00 |
Ya |
604 |
Kalimantan Tengah |
PP |
Fasilitas Pokok |
Trestle (m2) |
0 |
m2 |
8.023.200,00 |
Ya |
605 |
Sumatera Barat |
PP |
Fasilitas Pokok |
Jalan Komplek (m) |
0 |
m |
545.628,00 |
Ya |
606 |
Jawa Tengah |
PP |
Fasilitas Pokok |
Jetty (m2) |
0 |
m2 |
6.830.400,00 |
Ya |
607 |
Sumatera Selatan |
PP |
Fasilitas Pokok |
Revetment (m2) |
0 |
m2 |
7.623.200,00 |
Ya |
608 |
Sumatera Barat |
PP |
Fasilitas Pokok |
Pager (m2) |
0 |
m2 |
5.323.200,00 |
Ya |
609 |
Jawa Tengah |
PP |
Fasilitas Pokok |
Drainase (m) |
0 |
m2 |
426.900,00 |
Ya |
610 |
Sulawesi Utara |
PP |
Fasilitas Pokok |
Groin (m2) |
0 |
m2 |
8.240.000,00 |
Ya |
611 |
Maluku |
PP |
Fasilitas Pokok |
Jalan Komplek (m) |
0 |
m2 |
621.273,00 |
Ya |
612 |
Sumatera Selatan |
PP |
Fasilitas Pokok |
Groin (m2) |
0 |
m2 |
7.623.200,00 |
Ya |
613 |
Kep. Bangka Belitung |
PP |
Fasilitas Pokok |
Revetment (m2) |
0 |
m2 |
7.967.200,00 |
Ya |
614 |
Sulawesi Barat |
PP |
Fasilitas Pokok |
Groin (m2) |
0 |
m2 |
7.356.800,00 |
Ya |
615 |
Jawa Barat |
PP |
Fasilitas Pokok |
Jetty (m2) |
0 |
m2 |
7.128.000,00 |
Ya |
616 |
Maluku |
PP |
Fasilitas Pokok |
Trestle (m2) |
0 |
m2 |
8.081.600,00 |
Ya |
617 |
Gorontalo |
PP |
Fasilitas Pokok |
Jembatan (m2) |
0 |
m2 |
7.454.400,00 |
Ya |
618 |
Sulawesi Tengah |
PP |
Fasilitas Pokok |
Pager (m2) |
0 |
m2 |
5.076.000,00 |
Ya |
619 |
Kalimantan Barat |
PP |
Fasilitas Pokok |
Alur Pelayaran (m2) |
0 |
m2 |
67.113,00 |
Ya |
620 |
Kep. Bangka Belitung |
PP |
Fasilitas Pokok |
Jalan Komplek (m) |
0 |
m2 |
612.479,00 |
Ya |
621 |
Papua Barat |
PP |
Fasilitas Pokok |
Breakwater (m2) |
0 |
m2 |
181.515.000,00 |
Ya |
622 |
Jambi |
PP |
Fasilitas Pokok |
Alur Pelayaran (m2) |
0 |
m2 |
60.606,00 |
Ya |
623 |
Maluku |
PP |
Fasilitas Pokok |
Groin (m2) |
0 |
m2 |
8.081.600,00 |
Ya |
624 |
Bengkulu |
PP |
Fasilitas Pokok |
Revetment (m2) |
0 |
m2 |
7.183.200,00 |
Ya |
625 |
Riau |
PP |
Fasilitas Pokok |
Trestle (m2) |
0 |
m2 |
8.102.400,00 |
Ya |
626 |
Sulawesi Selatan |
PP |
Fasilitas Pokok |
Breakwater (m2) |
0 |
m2 |
128.835.000,00 |
Ya |
627 |
Kep. Bangka Belitung |
PP |
Fasilitas Pokok |
Groin (m2) |
0 |
m2 |
7.967.200,00 |
Ya |
628 |
Maluku Utara |
PP |
Fasilitas Pokok |
Pager (m2) |
0 |
m2 |
6.907.200,00 |
Ya |
629 |
Bengkulu |
PP |
Fasilitas Pokok |
Groin (m2) |
0 |
m2 |
7.183.200,00 |
Ya |
630 |
Kep. Riau |
PP |
Fasilitas Pokok |
Jembatan (m2) |
0 |
m2 |
8.753.600,00 |
Ya |
631 |
DKI. Jakarta |
PP |
Fasilitas Pokok |
Drainase (m) |
0 |
m2 |
500.000,00 |
Ya |
632 |
Sulawesi Selatan |
PP |
Fasilitas Pokok |
Jetty (m2) |
0 |
m2 |
6.871.200,00 |
Ya |
633 |
Kalimantan Timur |
PP |
Fasilitas Pokok |
Breakwater (m2) |
0 |
m2 |
150.000.000,00 |
Ya |
634 |
Papua Barat |
PP |
Fasilitas Pokok |
Jembatan (m2) |
0 |
m2 |
9.680.800,00 |
Ya |
635 |
Nusa Tenggara Barat |
PP |
Fasilitas Pokok |
Jalan Komplek (m) |
0 |
m2 |
492.615,00 |
Ya |
636 |
Sumatera Utara |
PP |
Fasilitas Pokok |
Jetty (m2) |
0 |
m2 |
7.673.600,00 |
Ya |
637 |
Kalimantan Timur |
PP |
Fasilitas Pokok |
Jetty (m2) |
0 |
m2 |
8.000.000,00 |
Ya |
638 |
Lampung |
PP |
Fasilitas Pokok |
Revetment (m2) |
0 |
m2 |
7.183.200,00 |
Ya |
639 |
Yogyakarta |
PP |
Fasilitas Pokok |
Jetty (m2) |
0 |
m2 |
6.921.600,00 |
Ya |
640 |
Sulawesi Tenggara |
PP |
Fasilitas Pokok |
Revetment (m2) |
0 |
m2 |
7.713.600,00 |
Ya |
641 |
Nusa Tenggara Timur |
PP |
Fasilitas Pokok |
Trestle (m2) |
0 |
m2 |
7.013.600,00 |
Ya |
642 |
Aceh |
PP |
Fasilitas Pokok |
Revetment (m2) |
0 |
m2 |
7.328.800,00 |
Ya |
643 |
Lampung |
PP |
Fasilitas Pokok |
Groin (m2) |
0 |
m2 |
7.183.200,00 |
Ya |
644 |
Kalimantan Utara |
PP |
Fasilitas Pokok |
Trestle (m2) |
0 |
m2 |
8.000.000,00 |
Ya |
645 |
Papua |
PP |
Fasilitas Pokok |
Jalan Komplek (m) |
0 |
m |
1.160.505,00 |
Ya |
646 |
Sumatera Barat |
PP |
Fasilitas Pokok |
Jetty (m2) |
0 |
m2 |
7.097.600,00 |
Ya |
647 |
Kalimantan Barat |
PP |
Fasilitas Pokok |
Groin (m2) |
0 |
m2 |
8.590.400,00 |
Ya |
648 |
Aceh |
PP |
Fasilitas Pokok |
Jembatan (m2) |
0 |
m2 |
7.328.800,00 |
Ya |
649 |
Kalimantan Barat |
PP |
Fasilitas Pokok |
Jetty (m2) |
0 |
m2 |
8.590.400,00 |
Ya |
650 |
Sumatera Selatan |
PP |
Fasilitas Pokok |
Alur Pelayaran (m2) |
0 |
m2 |
59.556,00 |
Ya |
651 |
Jawa Tengah |
PP |
Fasilitas Pokok |
Groin (m2) |
0 |
m2 |
6.830.400,00 |
Ya |
652 |
Sulawesi Barat |
PP |
Fasilitas Pokok |
Breakwater (m2) |
0 |
m2 |
137.940.000,00 |
Ya |
653 |
Sulawesi Utara |
PP |
Fasilitas Pokok |
Trestle (m2) |
0 |
m2 |
8.240.000,00 |
Ya |
654 |
Sulawesi Barat |
PP |
Fasilitas Pokok |
Pager (m2) |
0 |
m2 |
5.517.600,00 |
Ya |
655 |
Jawa Barat |
PP |
Fasilitas Pokok |
Drainase (m) |
0 |
m2 |
445.500,00 |
Ya |
656 |
Gorontalo |
PP |
Fasilitas Pokok |
Pager (m2) |
0 |
m2 |
5.590.800,00 |
Ya |
657 |
Sulawesi Tengah |
PP |
Fasilitas Pokok |
Groin (m2) |
0 |
m2 |
6.768.000,00 |
Ya |
658 |
Jambi |
PP |
Fasilitas Pokok |
Pager (m2) |
0 |
m2 |
5.818.200,00 |
Ya |
659 |
Bengkulu |
PP |
Fasilitas Pokok |
Alur Pelayaran (m2) |
0 |
m2 |
56.119,00 |
Ya |
660 |
Kep. Riau |
PP |
Fasilitas Pokok |
Jalan Komplek (m) |
0 |
m2 |
672.933,00 |
Ya |
661 |
DKI. Jakarta |
PP |
Fasilitas Pokok |
Revetment (m2) |
0 |
m2 |
8.000.000,00 |
Ya |
662 |
Riau |
PP |
Fasilitas Pokok |
Alur Pelayaran (m2) |
0 |
m2 |
63.300,00 |
Ya |
663 |
Sulawesi Selatan |
PP |
Fasilitas Pokok |
Pager (m2) |
0 |
m2 |
5.153.400,00 |
Ya |
664 |
Sulawesi Tengah |
PP |
Fasilitas Pokok |
Alur Pelayaran (m2) |
0 |
m2 |
52.875,00 |
Ya |
665 |
Kalimantan Selatan |
PP |
Fasilitas Pokok |
Pager (m2) |
0 |
m2 |
5.872.800,00 |
Ya |
666 |
DKI. Jakarta |
PP |
Fasilitas Pokok |
Groin (m2) |
0 |
m2 |
8.000.000,00 |
Ya |
667 |
Riau |
PP |
Fasilitas Pokok |
Groin (m2) |
0 |
m2 |
8.102.400,00 |
Ya |
668 |
Kalimantan Timur |
PP |
Fasilitas Pokok |
Pager (m2) |
0 |
m2 |
6.000.000,00 |
Ya |
669 |
Sulawesi Tenggara |
PP |
Fasilitas Pokok |
Jalan Komplek (m) |
0 |
m2 |
592.983,00 |
Ya |
670 |
Nusa Tenggara Barat |
PP |
Fasilitas Pokok |
Jembatan (m2) |
0 |
m2 |
6.408.000,00 |
Ya |
671 |
Kalimantan Selatan |
PP |
Fasilitas Pokok |
Jetty (m2) |
0 |
m2 |
7.830.400,00 |
Ya |
672 |
Nusa Tenggara Timur |
PP |
Fasilitas Pokok |
Drainase (m) |
0 |
m |
438.350,00 |
Ya |
673 |
Sumatera Utara |
PP |
Fasilitas Pokok |
Pager (m2) |
0 |
m2 |
5.755.200,00 |
Ya |
674 |
Papua |
PP |
Fasilitas Pokok |
Pager (m2) |
0 |
m2 |
11.322.000,00 |
Ya |
675 |
Lampung |
PP |
Fasilitas Pokok |
Alur Pelayaran (m2) |
0 |
m2 |
56.119,00 |
Ya |
676 |
Yogyakarta |
PP |
Fasilitas Pokok |
Drainase (m) |
0 |
m2 |
432.600,00 |
Ya |
677 |
Kalimantan Utara |
PP |
Fasilitas Pokok |
Drainase (m) |
0 |
m |
500.000,00 |
Ya |
678 |
Kalimantan Tengah |
PP |
Fasilitas Pokok |
Drainase (m) |
0 |
m |
501.450,00 |
Ya |
679 |
Papua |
PP |
Fasilitas Pokok |
Breakwater (m2) |
0 |
m2 |
283.050.000,00 |
Ya |
680 |
Kalimantan Barat |
PP |
Fasilitas Pokok |
Breakwater (m2) |
0 |
m2 |
161.070.000,00 |
Ya |
681 |
Kalimantan Tengah |
PP |
Fasilitas Pokok |
Revetment (m2) |
0 |
m2 |
8.023.200,00 |
Ya |
682 |
Maluku Utara |
PP |
Fasilitas Pokok |
Jalan Komplek (m) |
0 |
m |
707.988,00 |
Ya |
683 |
Jawa Tengah |
PP |
Fasilitas Pokok |
Revetment (m2) |
0 |
m2 |
6.830.400,00 |
Ya |
684 |
Sulawesi Utara |
PP |
Fasilitas Pokok |
Breakwater (m2) |
0 |
m2 |
154.500.000,00 |
Ya |
685 |
Sumatera Barat |
PP |
Fasilitas Pokok |
Drainase (m) |
0 |
m2 |
443.600,00 |
Ya |
686 |
Jawa Tengah |
PP |
Fasilitas Pokok |
Alur Pelayaran (m2) |
0 |
m2 |
53.363,00 |
Ya |
687 |
Sulawesi Utara |
PP |
Fasilitas Pokok |
Pager (m2) |
0 |
m2 |
6.180.000,00 |
Ya |
688 |
Sumatera Selatan |
PP |
Fasilitas Pokok |
Pager (m2) |
0 |
m2 |
5.717.400,00 |
Ya |
689 |
Kalimantan Utara |
PP |
Fasilitas Pokok |
Alur Pelayaran (m2) |
0 |
m2 |
62.500,00 |
Ya |
690 |
Sulawesi Barat |
PP |
Fasilitas Pokok |
Jetty (m2) |
0 |
m2 |
7.356.800,00 |
Ya |
691 |
Jawa Barat |
PP |
Fasilitas Pokok |
Revetment (m2) |
0 |
m2 |
7.128.000,00 |
Ya |
692 |
Gorontalo |
PP |
Fasilitas Pokok |
Revetment (m2) |
0 |
m2 |
7.454.400,00 |
Ya |
693 |
Sulawesi Tengah |
PP |
Fasilitas Pokok |
Jalan Komplek (m) |
0 |
m2 |
520.290,00 |
Ya |
694 |
Kep. Bangka Belitung |
PP |
Fasilitas Pokok |
Alur Pelayaran (m2) |
0 |
m2 |
62.244,00 |
Ya |
695 |
Jambi |
PP |
Fasilitas Pokok |
Trestle (m2) |
0 |
m2 |
7.757.600,00 |
Ya |
696 |
Jawa Barat |
PP |
Fasilitas Pokok |
Groin (m2) |
0 |
m2 |
7.128.000,00 |
Ya |
697 |
Maluku |
PP |
Fasilitas Pokok |
Jembatan (m2) |
0 |
m2 |
8.081.600,00 |
Ya |
698 |
Gorontalo |
PP |
Fasilitas Pokok |
Breakwater (m2) |
0 |
m2 |
139.770.000,00 |
Ya |
699 |
Sulawesi Tengah |
PP |
Fasilitas Pokok |
Jetty (m2) |
0 |
m2 |
6.768.000,00 |
Ya |
700 |
Riau |
PP |
Fasilitas Pokok |
Breakwater (m2) |
0 |
m2 |
151.920.000,00 |
Ya |
701 |
Kep. Bangka Belitung |
PP |
Fasilitas Pokok |
Jembatan (m2) |
0 |
m2 |
7.967.200,00 |
Ya |
702 |
Bengkulu |
PP |
Fasilitas Pokok |
Pager (m2) |
0 |
m2 |
5.387.400,00 |
Ya |
703 |
Kalimantan Selatan |
PP |
Fasilitas Pokok |
Breakwater (m2) |
0 |
m2 |
146.820.000,00 |
Ya |
704 |
DKI. Jakarta |
PP |
Fasilitas Pokok |
Alur Pelayaran (m2) |
0 |
m2 |
62.500,00 |
Ya |
705 |
Sulawesi Selatan |
PP |
Fasilitas Pokok |
Revetment (m2) |
0 |
m2 |
6.871.200,00 |
Ya |
706 |
Papua Barat |
PP |
Fasilitas Pokok |
Pager (m2) |
0 |
m2 |
7.260.600,00 |
Ya |
707 |
Kalimantan Selatan |
PP |
Fasilitas Pokok |
Groin (m2) |
0 |
m2 |
7.830.400,00 |
Ya |
708 |
Sumatera Utara |
PP |
Fasilitas Pokok |
Revetment (m2) |
0 |
m2 |
7.673.600,00 |
Ya |
709 |
Kalimantan Timur |
PP |
Fasilitas Pokok |
Revetment (m2) |
0 |
m2 |
8.000.000,00 |
Ya |
710 |
Papua |
PP |
Fasilitas Pokok |
Jetty (m2) |
0 |
m2 |
15.096.000,00 |
Ya |
711 |
Yogyakarta |
PP |
Fasilitas Pokok |
Revetment (m2) |
0 |
m2 |
6.921.600,00 |
Ya |
712 |
Sulawesi Tenggara |
PP |
Fasilitas Pokok |
Jembatan (m2) |
0 |
m2 |
7.713.600,00 |
Ya |
713 |
Nusa Tenggara Barat |
PP |
Fasilitas Pokok |
Trestle (m2) |
0 |
m2 |
6.408.000,00 |
Ya |
714 |
Nusa Tenggara Timur |
PP |
Fasilitas Pokok |
Groin (m2) |
0 |
m2 |
7.013.600,00 |
Ya |
715 |
Aceh |
PP |
Fasilitas Pokok |
Breakwater (m2) |
0 |
m2 |
137.415.000,00 |
Ya |
716 |
Lampung |
PP |
Fasilitas Pokok |
Pager (m2) |
0 |
m2 |
5.387.400,00 |
Ya |
717 |
Yogyakarta |
PP |
Fasilitas Pokok |
Groin (m2) |
0 |
m2 |
6.921.600,00 |
Ya |
718 |
Kalimantan Utara |
PP |
Fasilitas Pokok |
Groin (m2) |
0 |
m2 |
8.000.000,00 |
Ya |
719 |
Sumatera Barat |
PP |
Fasilitas Pokok |
Trestle (m2) |
0 |
m2 |
7.097.600,00 |
Ya |
720 |
Papua Barat |
PP |
Fasilitas Pokok |
Alur Pelayaran (m2) |
0 |
m2 |
75.631,00 |
Ya |
721 |
Kalimantan Barat |
PP |
Fasilitas Pokok |
Pager (m2) |
0 |
m2 |
6.442.800,00 |
Ya |
722 |
Aceh |
PP |
Fasilitas Pokok |
Drainase (m) |
0 |
m |
458.050,00 |
Ya |
723 |
Kalimantan Tengah |
PP |
Fasilitas Pokok |
Jetty (m2) |
0 |
m2 |
8.023.200,00 |
Ya |
724 |
Sumatera Barat |
PP |
Fasilitas Penunjang |
MCK (unit) |
0 |
m2 |
5.323.200,00 |
Ya |
725 |
DKI. Jakarta |
PP |
Fasilitas Penunjang |
Gapura (m) |
0 |
m2 |
6.000.000,00 |
Ya |
726 |
Sulawesi Selatan |
PP |
Fasilitas Penunjang |
MCK (unit) |
0 |
m2 |
5.153.400,00 |
Ya |
727 |
Maluku Utara |
PP |
Fasilitas Penunjang |
Tempat Peribadatan (m2) |
0 |
m2 |
6.907.200,00 |
Ya |
728 |
Kalimantan Timur |
PP |
Fasilitas Penunjang |
Parkir (m2) |
0 |
m2 |
6.000.000,00 |
Ya |
729 |
Lampung |
PP |
Fasilitas Penunjang |
Tempat Peribadatan (m2) |
0 |
m2 |
5.387.400,00 |
Ya |
730 |
Papua Barat |
PP |
Fasilitas Penunjang |
Mess Karyawan (m2) |
0 |
m2 |
7.260.600,00 |
Ya |
731 |
Sulawesi Tenggara |
PP |
Fasilitas Penunjang |
Pos Jaga (unit) |
0 |
m2 |
5.785.200,00 |
Ya |
732 |
Nusa Tenggara Barat |
PP |
Fasilitas Penunjang |
MCK (unit) |
0 |
m2 |
4.806.000,00 |
Ya |
733 |
Bengkulu |
PP |
Fasilitas Penunjang |
Parkir (m2) |
0 |
m2 |
5.387.400,00 |
Ya |
734 |
Riau |
PP |
Fasilitas Penunjang |
MCK (unit) |
0 |
m2 |
6.076.800,00 |
Ya |
735 |
Lampung |
PP |
Fasilitas Penunjang |
Mess Karyawan (m2) |
0 |
m2 |
5.387.400,00 |
Ya |
736 |
Kalimantan Utara |
PP |
Fasilitas Penunjang |
Parkir (m2) |
0 |
m2 |
6.000.000,00 |
Ya |
737 |
Bengkulu |
PP |
Fasilitas Penunjang |
Balai Pertemuan Nelayan (m2) |
0 |
m2 |
5.387.400,00 |
Ya |
738 |
Kalimantan Selatan |
PP |
Fasilitas Penunjang |
Pos Jaga (unit) |
0 |
m2 |
5.872.800,00 |
Ya |
739 |
Nusa Tenggara Timur |
PP |
Fasilitas Penunjang |
Parkir (m2) |
0 |
m2 |
5.260.200,00 |
Ya |
740 |
Sumatera Utara |
PP |
Fasilitas Penunjang |
Pos Jaga (unit) |
0 |
m2 |
5.755.200,00 |
Ya |
741 |
Kalimantan Barat |
PP |
Fasilitas Penunjang |
Pos Jaga (unit) |
0 |
m2 |
6.442.800,00 |
Ya |
742 |
Aceh |
PP |
Fasilitas Penunjang |
Gapura (m) |
0 |
m |
5.496.600,00 |
Ya |
743 |
Kep. Bangka Belitung |
PP |
Fasilitas Penunjang |
MCK (unit) |
0 |
m2 |
5.975.400,00 |
Ya |
744 |
Jawa Tengah |
PP |
Fasilitas Penunjang |
Gapura (m) |
0 |
m2 |
5.122.800,00 |
Ya |
745 |
Gorontalo |
PP |
Fasilitas Penunjang |
Balai Pertemuan Nelayan (m2) |
0 |
m2 |
5.590.800,00 |
Ya |
746 |
Sulawesi Utara |
PP |
Fasilitas Penunjang |
Rumah Dinas (m2) |
0 |
m2 |
6.180.000,00 |
Ya |
747 |
Kalimantan Selatan |
PP |
Fasilitas Penunjang |
Gapura (m) |
0 |
m2 |
5.872.800,00 |
Ya |
748 |
Sumatera Utara |
PP |
Fasilitas Penunjang |
Balai Pertemuan Nelayan (m2) |
0 |
m2 |
5.755.200,00 |
Ya |
749 |
Jawa Barat |
PP |
Fasilitas Penunjang |
Tempat Peribadatan (m2) |
0 |
m2 |
5.346.000,00 |
Ya |
750 |
Maluku |
PP |
Fasilitas Penunjang |
Mess Karyawan (m2) |
0 |
m2 |
6.061.200,00 |
Ya |
751 |
Sumatera Selatan |
PP |
Fasilitas Penunjang |
Pos Jaga (unit) |
0 |
m2 |
5.717.400,00 |
Ya |
752 |
Kalimantan Tengah |
PP |
Fasilitas Penunjang |
Gapura (m) |
0 |
m2 |
6.017.400,00 |
Ya |
753 |
Sumatera Barat |
PP |
Fasilitas Penunjang |
Tempat Peribadatan (m2) |
0 |
m2 |
5.323.200,00 |
Ya |
754 |
Jambi |
PP |
Fasilitas Penunjang |
MCK (unit) |
0 |
m2 |
5.818.200,00 |
Ya |
755 |
Papua |
PP |
Fasilitas Penunjang |
Gapura (m) |
0 |
m2 |
11.322.000,00 |
Ya |
756 |
Jawa Barat |
PP |
Fasilitas Penunjang |
Mess Karyawan (m2) |
0 |
m2 |
5.346.000,00 |
Ya |
757 |
Sulawesi Tengah |
PP |
Fasilitas Penunjang |
Gapura (m) |
0 |
m2 |
5.076.000,00 |
Ya |
758 |
Sumatera Selatan |
PP |
Fasilitas Penunjang |
Balai Pertemuan Nelayan (m2) |
0 |
m2 |
5.717.400,00 |
Ya |
759 |
DKI. Jakarta |
PP |
Fasilitas Penunjang |
Tempat Peribadatan (m2) |
0 |
m2 |
6.000.000,00 |
Ya |
760 |
Sulawesi Barat |
PP |
Fasilitas Penunjang |
MCK (unit) |
0 |
m2 |
5.517.600,00 |
Ya |
761 |
Sulawesi Selatan |
PP |
Fasilitas Penunjang |
Tempat Peribadatan (m2) |
0 |
m2 |
5.153.400,00 |
Ya |
762 |
Sumatera Barat |
PP |
Fasilitas Penunjang |
Gapura (m) |
0 |
m |
5.323.200,00 |
Ya |
763 |
DKI. Jakarta |
PP |
Fasilitas Penunjang |
Mess Karyawan (m2) |
0 |
m2 |
6.000.000,00 |
Ya |
764 |
Sulawesi Selatan |
PP |
Fasilitas Penunjang |
Balai Pertemuan Nelayan (m2) |
0 |
m2 |
5.153.400,00 |
Ya |
765 |
Kalimantan Timur |
PP |
Fasilitas Penunjang |
Tempat Peribadatan (m2) |
0 |
m2 |
6.000.000,00 |
Ya |
766 |
Nusa Tenggara Barat |
PP |
Fasilitas Penunjang |
Rumah Dinas (m2) |
0 |
m2 |
4.806.000,00 |
Ya |
767 |
Kalimantan Timur |
PP |
Fasilitas Penunjang |
MCK (unit) |
0 |
m2 |
6.000.000,00 |
Ya |
768 |
Lampung |
PP |
Fasilitas Penunjang |
MCK (unit) |
0 |
m2 |
5.387.400,00 |
Ya |
769 |
Papua Barat |
PP |
Fasilitas Penunjang |
Gapura (m) |
0 |
m2 |
7.260.600,00 |
Ya |
770 |
Sulawesi Tenggara |
PP |
Fasilitas Penunjang |
MCK (unit) |
0 |
m2 |
5.785.200,00 |
Ya |
771 |
Nusa Tenggara Barat |
PP |
Fasilitas Penunjang |
Balai Pertemuan Nelayan (m2) |
0 |
m2 |
4.806.000,00 |
Ya |
772 |
Gorontalo |
PP |
Fasilitas Penunjang |
Tempat Peribadatan (m2) |
0 |
m2 |
5.590.800,00 |
Ya |
773 |
Aceh |
PP |
Fasilitas Penunjang |
Pos Jaga (unit) |
0 |
m2 |
5.496.600,00 |
Ya |
774 |
Kalimantan Utara |
PP |
Fasilitas Penunjang |
MCK (unit) |
0 |
m2 |
6.000.000,00 |
Ya |
775 |
Jawa Tengah |
PP |
Fasilitas Penunjang |
Tempat Peribadatan (m2) |
0 |
m2 |
5.122.800,00 |
Ya |
776 |
Gorontalo |
PP |
Fasilitas Penunjang |
Parkir (m2) |
0 |
m2 |
5.590.800,00 |
Ya |
777 |
Kalimantan Selatan |
PP |
Fasilitas Penunjang |
Mess Karyawan (m2) |
0 |
m2 |
5.872.800,00 |
Ya |
778 |
Nusa Tenggara Timur |
PP |
Fasilitas Penunjang |
Kios Nelayan/Toko/Waserda (unit) |
0 |
m2 |
5.260.200,00 |
Ya |
779 |
Kalimantan Barat |
PP |
Fasilitas Penunjang |
Mess Karyawan (m2) |
0 |
m2 |
6.442.800,00 |
Ya |
780 |
Aceh |
PP |
Fasilitas Penunjang |
Rumah Dinas (m2) |
0 |
m2 |
5.496.600,00 |
Ya |
781 |
Kep. Bangka Belitung |
PP |
Fasilitas Penunjang |
Balai Pertemuan Nelayan (m2) |
0 |
m2 |
5.975.400,00 |
Ya |
782 |
Jawa Tengah |
PP |
Fasilitas Penunjang |
Mess Karyawan (m2) |
0 |
m2 |
5.122.800,00 |
Ya |
783 |
Sulawesi Utara |
PP |
Fasilitas Penunjang |
Mess Karyawan (m2) |
0 |
m2 |
6.180.000,00 |
Ya |
784 |
Kalimantan Tengah |
PP |
Fasilitas Penunjang |
Pos Jaga (unit) |
0 |
m2 |
6.017.400,00 |
Ya |
785 |
Kep. Riau |
PP |
Fasilitas Penunjang |
Kios Nelayan/Toko/Waserda (unit) |
0 |
m2 |
6.565.200,00 |
Ya |
786 |
Jawa Barat |
PP |
Fasilitas Penunjang |
MCK (unit) |
0 |
m2 |
5.346.000,00 |
Ya |
787 |
Maluku |
PP |
Fasilitas Penunjang |
Gapura (m) |
0 |
m2 |
6.061.200,00 |
Ya |
788 |
Sulawesi Tengah |
PP |
Fasilitas Penunjang |
Pos Jaga (unit) |
0 |
m2 |
5.076.000,00 |
Ya |
789 |
Sulawesi Barat |
PP |
Fasilitas Penunjang |
Pos Jaga (unit) |
0 |
m2 |
5.517.600,00 |
Ya |
790 |
Jambi |
PP |
Fasilitas Penunjang |
Rumah Dinas (m2) |
0 |
m2 |
5.818.200,00 |
Ya |
791 |
Kep. Riau |
PP |
Fasilitas Penunjang |
Mess Karyawan (m2) |
0 |
m2 |
6.565.200,00 |
Ya |
792 |
DKI. Jakarta |
PP |
Fasilitas Penunjang |
MCK (unit) |
0 |
m2 |
6.000.000,00 |
Ya |
793 |
Sulawesi Barat |
PP |
Fasilitas Penunjang |
Gapura (m) |
0 |
m2 |
5.517.600,00 |
Ya |
794 |
Sulawesi Selatan |
PP |
Fasilitas Penunjang |
Parkir (m2) |
0 |
m2 |
5.153.400,00 |
Ya |
795 |
Sumatera Barat |
PP |
Fasilitas Penunjang |
Rumah Dinas (m2) |
0 |
m2 |
5.323.200,00 |
Ya |
796 |
Maluku Utara |
PP |
Fasilitas Penunjang |
MCK (unit) |
0 |
Unit |
6.907.200,00 |
Ya |
797 |
Papua Barat |
PP |
Fasilitas Penunjang |
Pos Jaga (unit) |
0 |
m2 |
7.260.600,00 |
Ya |
798 |
Sulawesi Tenggara |
PP |
Fasilitas Penunjang |
Rumah Dinas (m2) |
0 |
m2 |
5.785.200,00 |
Ya |
799 |
Nusa Tenggara Barat |
PP |
Fasilitas Penunjang |
Parkir (m2) |
0 |
m2 |
4.806.000,00 |
Ya |
800 |
Bengkulu |
PP |
Fasilitas Penunjang |
Pos Jaga (unit) |
0 |
m2 |
5.387.400,00 |
Ya |
801 |
Riau |
PP |
Fasilitas Penunjang |
Parkir (m2) |
0 |
m2 |
6.076.800,00 |
Ya |
802 |
Lampung |
PP |
Fasilitas Penunjang |
Balai Pertemuan Nelayan (m2) |
0 |
m2 |
5.387.400,00 |
Ya |
803 |
Sulawesi Tenggara |
PP |
Fasilitas Penunjang |
Balai Pertemuan Nelayan (m2) |
0 |
m2 |
5.785.200,00 |
Ya |
804 |
Kalimantan Utara |
PP |
Fasilitas Penunjang |
Pos Jaga (unit) |
0 |
m2 |
6.000.000,00 |
Ya |
805 |
Bengkulu |
PP |
Fasilitas Penunjang |
Kios Nelayan/Toko/Waserda (unit) |
0 |
m2 |
5.387.400,00 |
Ya |
806 |
Kalimantan Selatan |
PP |
Fasilitas Penunjang |
Rumah Dinas (m2) |
0 |
m2 |
5.872.800,00 |
Ya |
807 |
Nusa Tenggara Timur |
PP |
Fasilitas Penunjang |
Rumah Dinas (m2) |
0 |
m2 |
5.260.200,00 |
Ya |
808 |
Riau |
PP |
Fasilitas Penunjang |
Rumah Dinas (m2) |
0 |
m2 |
6.076.800,00 |
Ya |
809 |
Kalimantan Barat |
PP |
Fasilitas Penunjang |
Tempat Peribadatan (m2) |
0 |
m2 |
6.442.800,00 |
Ya |
810 |
Aceh |
PP |
Fasilitas Penunjang |
MCK (unit) |
0 |
m2 |
5.496.600,00 |
Ya |
811 |
Kalimantan Utara |
PP |
Fasilitas Penunjang |
Balai Pertemuan Nelayan (m2) |
0 |
m2 |
6.000.000,00 |
Ya |
812 |
Maluku Utara |
PP |
Fasilitas Penunjang |
Mess Karyawan (m2) |
0 |
m2 |
6.907.200,00 |
Ya |
813 |
Kep. Bangka Belitung |
PP |
Fasilitas Penunjang |
Pos Jaga (unit) |
0 |
m2 |
5.975.400,00 |
Ya |
814 |
Jawa Tengah |
PP |
Fasilitas Penunjang |
MCK (unit) |
0 |
m2 |
5.122.800,00 |
Ya |
815 |
Gorontalo |
PP |
Fasilitas Penunjang |
Kios Nelayan/Toko/Waserda (unit) |
0 |
m2 |
5.590.800,00 |
Ya |
816 |
Sumatera Utara |
PP |
Fasilitas Penunjang |
Kios Nelayan/Toko/Waserda (unit) |
0 |
m2 |
5.755.200,00 |
Ya |
817 |
Kalimantan Barat |
PP |
Fasilitas Penunjang |
Gapura (m) |
0 |
m2 |
6.442.800,00 |
Ya |
818 |
Sulawesi Utara |
PP |
Fasilitas Penunjang |
Gapura (m) |
0 |
m2 |
6.180.000,00 |
Ya |
819 |
Papua |
PP |
Fasilitas Penunjang |
Rumah Dinas (m2) |
0 |
m2 |
11.322.000,00 |
Ya |
820 |
Maluku |
PP |
Fasilitas Penunjang |
Pos Jaga (unit) |
0 |
m2 |
6.061.200,00 |
Ya |
821 |
Sumatera Selatan |
PP |
Fasilitas Penunjang |
Tempat Peribadatan (m2) |
0 |
m2 |